How are valves typically inspected upon arrival at the factory, and what tests are carried out?
Reply #22019-03-26
The installation unit is responsible for the pressure testing, while the supervision unit is responsible for overseeing the acceptance process. Party A should also participate in it. The signature confirming successful acceptance must be archived in written form.
Reply #32019-03-26
Generally, it includes the following: Appearance: Check for any casting defects on the surface of the valve castings (porosity, surface roughness), the quality of welding, whether there are burrs or sharp edges on the holes, and whether the flange sealing surfaces are damaged. The quality of forgings is generally fine. For carbon steel components, check whether the surface paint is peeling or flaking, and whether the color codes meet the requirements (adhesion testing is a destructive test, so it is not necessary to conduct it upon arrival at the factory). Labels: Verify that the valve body contains information such as the material type, furnace number, and series number; ensure that the nameplate/tag meets the requirements (in accordance with the contract and technical agreements). Dimensions: Recheck the main connection dimensions according to batch requirements and sampling protocols; measure structural lengths, flange sizes, etc. Performance testing: If conditions permit at the factory, random samples can be taken for pressure testing. Functional test: Operate the valve several times to determine if there is any interference. For bare valves, before installing the actuator, a torque test report must be reviewed: material quality certificates, test reports, factory inspection reports, certificates of conformity, and any other special requirements as specified in the contract

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.