HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

How do you determine which pipes need stress calculation? Which pipes can be considered stress-free based on experience?

2017-02-26View Original

Thread Content

How do you determine which pipes need stress calculation? Which pipes can be considered stress-free based on experience?
Reply #22017-02-28
The classification in the \"Code for Flexible Design of Petrochemical Pipelines—SH/T3041-2016\" can be used as a reference, although it is relatively rough; generally, the process is classified based on the pipeline list specific to each project.
Reply #32017-03-01
Typically, companies have their own specialized procedure documents for stress management, which are usually more detailed than those specified in the standards. As long as one follows those standard procedures, there should be no problems; if the requirements aren’t very strict, following the standards is generally sufficient as well.
Reply #42017-08-05
Refer to the pipeline design specifications and codes for the relevant industry

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.