HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is there a parameter for corrosion amount that needs to be filled in in Caesar?

2017-03-28View Original

Thread Content

Is there a parameter for corrosion amount that needs to be filled in in Caesar? In the calculation of the pipe wall thickness, the amount of corrosion has been taken into account. Or is it not the same thing?
Reply #22017-03-28
I’m writing this for others to read; it’s necessary for calculations.
Reply #32017-03-29
As mentioned upstairs, it was said that something needs to be written, but the reason wasn’t explained clearly. Let me explain it. When calculating the wall thickness, a corrosion allowance was taken into account, which is intended to ensure a proper service life. In C2, the corrosion consideration takes into account the stress after wall thickness reduction. So the aspects considered are different.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.