Announcement on Direct Procurement for the Design of Liaoning Datang International’s 24.57 billion yuan Fuxin coal-to-natural gas project

2025-09-18View Original

Thread Content

According to Coal Chemical Industry 365, the Fuxin coal-to-natural gas project operated by Liaoning Datang International has a total investment of 24.57 billion yuan and covers an area of 354.35 hectares. Its production capacity is 4 billion cubic meters of coal-to-natural gas per year (12 million cubic meters per day); the coal intended for use in this project comes from the lignite produced at Datang Xilinhot Dongshengli No. 2 Coal Mine. The pressure swing gasification process is employed, and after going through units such as low-temperature methanol washing, sulfur recovery, and methanation, high-quality natural gas is produced. The main by-products include tar, crude phenol, sulfur, ammonium sulfate, and liquid ammonia. The entire project will be constructed in three phases on a rolling basis, with each phase having a capacity of 1.33 billion standard cubic meters per year; the first phase is currently under implementation. In 2025, the first phase of the Fuxin project will continue to be constructed. After the revision of the foundation design, additional optimized technical improvement projects and standard-upgrading projects will require the original design to be supplemented in accordance with **new safety and environmental protection standards and regulations. Direct procurement for the technical upgrading, renovation, and optimization design services for the first-phase gasification and purification facilities at Sino-Singapore New Energy Fuxin Company. Scope of procurement: (1) Completing the design for methane recovery from the purified exhaust gases, the design for relocating the gasification unit rooms and substations, as well as the design for separating coal gas from water and recovering dust-containing tar, along with the renovation of related piping systems – all tasks that require technical upgrading, renovation, and optimization design services as part of Fuxin Company’s basic design revisions for 2025. (2) The safety design diagnosis services for the entire Fuxin plant include, but are not limited to, the following units and areas: air separation, gasification, purification, methanation, wastewater treatment, utility systems, auxiliary engineering systems, as well as related systems outside the plant. (3) Preparation and review of feasibility study reports for the Phenol-Amine Recovery Series C, RTO units, low-methane recovery projects, low-methane tar No. 0 deodorization projects, and projects involving the use of acidic gases in power boilers; preparation and review of the basic design for the Phenol-Amine Recovery Series C. The procurement method is direct procurement: Saiding Engineering Co., Ltd. is overall responsible for carrying out the preliminary design and detailed design work for the gasification and purification units of Fuxin Company’s Phase 1 project. During the basic design revision in 2017, Saiding Engineering Co., Ltd. was involved in this crucial revision process as part of the installation design team, and it completed with high quality the basic design and detailed design work for all projects related to the additional technical improvements and optimizations for the gasification and purification units, as well as the standard upgrades. In 2025, work resumed on the Fuxin project, and efforts were made once again to revise the foundation design. As a key player in the foundation design and detailed design of the company’s important projects, Saiding Engineering Co., Ltd. participated in this revision process once more as part of the design team, and successfully completed the foundation design for the technical upgrades, improvements, and standard enhancements related to the gasification and purification units. The preliminary design and detailed design of the gasification and purification units have all been carried out by Saiding Engineering Co., Ltd. This company has a thorough understanding of the interconnections between various systems in the project, the compatibility requirements of the equipment, as well as the key aspects related to construction sequencing; it is thus able to accurately identify the challenges associated with integrating new technical modifications into the existing design. This procurement is for the design of technical upgrades, optimizations, and standard improvements for gasification and purification facilities. To ensure that the newly designed elements integrate seamlessly with the existing systems, and to avoid issues such as conflicts in technical parameters, mismatches in equipment, or disruptions in the construction process that could result from changing the design contractor, it is necessary to ensure the completeness and continuity of the project design; therefore, direct procurement from Saiding Engineering Co., Ltd. is planned.
Reply #22025-09-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】2686–2025: Breaking Technological Monopolies – China’s first domestically developed air compressors for pumped storage power stations have been put into use successfully. https://bbs.hcbbs.com/thread-5700898-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #32025-09-19
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s largest \"linear Fresnel\" photothermal integrated energy demonstration project, 2687-2025, now operates at full capacity for power generation https://bbs.hcbbs.com/thread-5701500-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-09-19
【Ten Years of Rapid Development in Chemical Equipment】2689-2025: Filling gaps in the domestic market; Sinopec releases its 60K large-tow carbon fiber product. https://bbs.hcbbs.com/thread-5701543-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-09-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】2692-2025: China’s first pilot project for using microorganisms to convert carbon dioxide into feed protein has achieved successful trial production https://bbs.hcbbs.com/thread-5701661-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-09-22
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2693 to 2025: Researchers at Dalian Institute of Chemical Physics developed the first prototype battery using hydrogen anions https://bbs.hcbbs.com/thread-5701676-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-09-24
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in the research and development of liquid hydrogen production equipment in China from 2026 to 2025 https://bbs.hcbbs.com/thread-5701766-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #82025-09-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】World-leading transformative technology for dehydration through coupled reactions of solid materials, 2698–2025 https://bbs.hcbbs.com/thread-5701768-1-1.html (Source: Haichuan Chemical Engineering Forum)
Reply #92025-09-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The project under the key research and development program 2699-2025, titled “Research on Key Equipment for the Production, Storage, Transportation, and Refueling of Liquid Hydrogen sowie Related Safety Aspects,” has successfully passed the comprehensive performance evaluation. https://bbs.hcbbs.com/thread-5701769-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-09-25
【Ten Years of Rapid Development in Chemical Engineering Equipment】The World’s First Methanol Dual-Fuel Ship with 9300 CEU Sets Sail from 2700 to 2025 https://bbs.hcbbs.com/thread-5701791-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-09-26
【Ten Years of Rapid Development in Chemical Engineering Equipment】By 2025, China will have independently developed 175,000 cubic meter large-scale LNG transport ships – delivery completed https://bbs.hcbbs.com/thread-5701843-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.