What size of storage tank requires settlement monitoring? ? ?

2025-12-13View Original

Thread Content

What size of storage tank requires settlement monitoring? ? ?
Reply #22025-12-13
【Haichuan Chemical Technology Documentation】How are the design temperature and design pressure of equipment and pipelines determined? https://bbs.hcbbs.com/thread-5708207-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #32025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-14
Generally, it’s 1,000 cubic meters; being conservative, it could be 500 cubic meters
Reply #52025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that makes use of pressure energy was officially put into operation in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCBBS Chemical Forum)
Reply #72025-12-15
【Ten Years of Rapid Development in Chemical Equipment】2899-2025: Hengyang Valin Steel Pipe collaborates with Danielei to build the world’s largest hot continuous rolling production line for seamless steel pipes https://bbs.hcbbs.com/thread-5708317-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #82025-12-15
【Ten Years of Rapid Development in Chemical Equipment】2881-2025: China’s company undertakes the general contracting for the world’s largest MTBE plant, which began operations ahead of schedule https://bbs.hcbbs.com/thread-5707365-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #92025-12-16
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #102025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.