HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Treatment of unused areas within the fire separation distance

2025-10-24View Original

Thread Content

Case: In the unused area on the west side of the cabinet room in Utility Workshop 1, a fire separation distance of 10m is required, but the current distance is 9m – it is insufficient. Can this unused area be left as it is without demolition? If demolition is mandatory, can a firewall be installed to create a separation? If demolition is mandatory, won’t the part that is removed affect the entire building?
Reply #22025-10-31
This depends on the opinions of the local emergency management department. Under normal circumstances, if it can indeed be ensured that no functional uses are assigned to the idle area (it remains empty most of the time, with perhaps only some tools of the Ding and Wu types stored there), then the fire separation distance can be measured from the eastern edge of the utility workshops to the western side of the cabinet room. )

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.