Thread Content
The Coal-to-Oil Branch strengthens organization to advance the membrane separation renovation project efficiently. Author/Source: Yankuang Future Energy. Date: August 23, 2021. Clicks: 19. At 18:00 on August 21, the concrete pouring for the compressor foundation in the raw material gas inlet section of the low-carbon hydrocarbon recovery unit of the Coal-to-Oil Branch was completed, 6 days ahead of schedule. This marked the full completion of the civil engineering work for this project, paving the way for construction of the tasks above ground level. At the beginning of this year, in order to further increase the production of low-carbon hydrocarbon liquid products and hydrogen recovery from coal-to-oil plants and to enhance the economic efficiency of these systems, the Coal-to-Oil Branch initiated the construction of a membrane separation project. Once completed and put into operation in December 2021, this project is capable of recovering 25,000 standard cubic meters per hour, resulting in the production of 8,000 tons of liquid products per year. This generates economic benefits of over 11 million yuan, while ensuring the stable operation of low-carbon hydrocarbons over a long period of time and maximizing economic returns. This project is one of the four key construction projects of the Coal-to-Oil Division for 2021, and it represents a \"value-creating project\" that helps improve the efficiency and productivity of the coal-to-oil system while reducing energy consumption and emissions.