HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Chengda Company – Announcement regarding the pneumatic cut-off valve (high-pressure Y-type valve) for Project 3 of Xinjiang Lanshan Tunhe Energy Co., Ltd., with a production capacity of 100,000 tons of BDO

2022-03-03View Original

Thread Content

Chengda Company – Announcement regarding the pneumatic isolation valve (high-pressure Y-type valve) for Project Phase 3 of Xinjiang Lanshan Tunhe Energy Co., Ltd., involving 100,000 tons of BDO production. Author/Source: Date: 2022-03-03; Clicks: 10. 1. Procurement conditions: The funding for Project Phase 3 of Xinjiang Lanshan Tunhe Energy Co., Ltd., which involves 100,000 tons of BDO production, has been secured by China Chengda Engineering Co., Ltd.; thus, the conditions for issuing a tender for the pneumatic isolation valve (high-pressure Y-type valve) for this project are met*. The tenderer is China Chengda Engineering Co., Ltd., and public competitive negotiation procurement is now being carried out. 2. Procurement Content and Scope 2.1 Procurement content and scope for this project: (1) Lot/Package number: * Lot/Package name: Chengda Company – Xinjiang Lanshan Tunhe Energy Co., Ltd.’s Phase 3 100,000-ton BDO project – Pneumatic shut-off valves (high-pressure Y-type valves). Procurement content and scope: 3 pneumatic shut-off valves (high-pressure Y-type valves). 2.2 Delivery deadline: Bidders are requested to indicate the fastest possible delivery time. 2.3 Delivery location: Lama Huliang Industrial Park, Qitai County, Changji Prefecture, Xinjiang – Chengda Lanshan Tunhe Phase 3 Project Site. 2.4 Quality standards or main technical specifications for the goods: Refer to the attachments in the tender documents (to be downloaded after successful registration). 2.5 Other details: 2.5.1 Both domestic and imported materials shall be quoted on a DDP basis, i.e., including taxes, necessary spare parts, and specialized tools. 2.5.2 The spare parts for two years are offered as an optional item and are not included in the total price. 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders 3.1 Qualification requirements for bidders 3.1.1 The bidder must be an independent legal entity under the People’s Republic of China, possess a valid business license, have a registered capital of 3 million yuan or more, have been in operation for at least 3 years, and be qualified as a general VAT taxpayer. 3.1.2 Bidders must *register. 3.1.3 Manufacturers on the list of qualified suppliers for this project. 3.1.4 In principle, only manufacturers are allowed to submit bids for this procurement package; if a manufacturer can only bid through an agent, it must provide a document confirming its exclusive authorization to do so. 3.1.5 Meet the qualification requirements related to the project. 3.1.6 Have good bank credit and commercial reputation, have not been ordered to suspend operations, have their assets not seized or frozen, and are not in a state of bankruptcy; there are no property disputes. 3.4 In principle, direct submissions by manufacturers are only allowed; if a manufacturer can only submit bids through an agent, it must provide a document confirming its exclusive authorization. 3.2 Bidders shall not fall under any of the following circumstances: (1) Being the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in procurement activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permits temporarily seized or revoked, or its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④According to the company’s management requirements, those who are prohibited from participating in procurement activities and whose restrictions are still in effect. 3.3 Whether the project accepts consortia: Yes/No. The parties involved in a consortium shall, in accordance with their division of responsibilities as stipulated in the agreement, meet the corresponding conditions and requirements set out in paragraph 3.1 of this article ; None of the parties to the consortium shall be in the situation specified in paragraph 3.2 of this article ; None of the parties in the consortium shall submit response documents on their own behalf, nor shall they participate in the procurement process for this project as part of another consortium. Otherwise, all relevant response documents will be invalid. 4. Registration and login (please log in). 5. Procurement registration: Is procurement registration required? No/Yes. 5.1 Registration period: From 2022-03-02 15:17 to 2022-03-05 16:00 (Beijing time). 5.2 Registration method: (Please log in). 6. Access to procurement documents. 6.1 Access period: From 2022-03-02 15:17 to 2022-03-05 16:00 (Beijing time). This tender project is available only for official members to view; your current permissions do not allow access to detailed information. Please click to register/log in, or contact the staff to become an official member, after which you will be able to obtain detailed tender announcements, application forms, project attachments, and some of the tender documents related to this project.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.