Thread Content
Call for Bid for the Feasibility Study Report on the Comprehensive Utilization of Green Hydrogen and Zero-Carbon Methanol Production in the Yumen Oilfield’s Refining Complex for the Period 2022–2025 Author/Source: Date: 2022-04-26 Clicks: 4 Project Name: Feasibility Study Report on the Comprehensive Utilization of Green Hydrogen and Zero-Carbon Methanol Production in the Yumen Oilfield’s Refining Complex for the Period 2022–2025 (Second Round) Project Overview: 1.1 Basic Information: The refining complex plans to use refinery dry gas as a raw material. Through steam reforming and waste heat recovery, this dry gas will be converted into syngas, which contains hydrogen, CO, CO2, N2, and residual CH4. The steam reformer requires external combustion for heating; in addition to the off-gases from the methanol removal unit, refinery dry gas must also be supplied as fuel. The flue gases after combustion are sent to the newly built CO2 capture unit, where high-concentration CO2 is obtained through efficient absorption and desorption using amine solutions. A new green methanol plant will be constructed to produce methanol using syngas generated by the hydrogen production unit and that CO2 as raw materials, with an annual production capacity of 80,000 tons. A feasibility study report for the project of comprehensive utilization of green hydrogen and \"zero-carbon\" methanol production at the Yumen Oilfield’s refining complex for the period 2022–2025 will be prepared. Project owner: Yumen Oilfield Refining and Chemical Complex. Project category: Service-based. Project sub-category: Other. Supplier qualification requirements: 1. Joint ventures are not accepted for this procurement. 2. Legal persons or other organizations registered within the People’s Republic of China, possessing a valid business license or certificate of legal person status for public institutions. Possess Class A comprehensive engineering design qualifications or Class A design qualifications for the chemical, petrochemical, and pharmaceutical industries. 3. Have a good business reputation and sound financial accounting systems; are not under orders to cease operations, have their assets seized, or are bankrupt; and possess sufficient assets and capabilities to fulfill the contractual obligations as promised in writing. 4. Not listed as a person who fails to fulfill obligations by the people’s court on the Credit China Information Disclosure System (http://www.creditchina.gov.cn/); attached are screenshots of the search results from the website along with the URL for the search ; It has not been included on the blacklist of enterprises with serious violations and dishonesty by CNPC and Yumen Oilfield. Obtaining procurement documents: Obtaining procurement documents: 1. Deadline for purchasing the bidding documents: Suppliers interested in participating are requested to register* between 09:00 on April 26, 2022, and 09:00 on April 29, 2022 (please log in). 2. The price of each set of negotiation documents is 600 RMB, and no refund will be given after purchase. This tender project is available only for official members to view. Your current permissions do not allow access to detailed information. Please click on Register/Login, or contact the staff to become an official member; only then can you obtain the detailed tender announcements, application forms, project attachments, and certain tender documents related to the project.