Thread Content
Bid Announcement for the Steel Structure Fabrication of the Gas Power Platform and Comprehensive Utilization Project of Synthesis Gas at Hualu Hengsheng (Jingzhou) Co., Ltd. Author/Source: Date: 2022-07-04 Clicks: 8 I. Project Overview Hualu Hengsheng (***) Company has obtained approval from its superior authorities for the bidding of this project; the construction funds have been secured, and all conditions for bidding are met. A public tender is now being issued for the fabrication of the steel structures for its gas power platform and syngas comprehensive utilization project. Qualified bidders are welcome to submit bids. II. Basic Information of the Project 1. Project Name: Hualu Hengsheng (**** Company) Park Gas Power Platform and Comprehensive Utilization of Synthesis Gas Project – Steel Structure Processing and Fabrication 2. Project Category: Goods-related 3. Procurement Method: Open bidding 4. Procurement Content: ******** Project Overview: Project Name: Hualu Hengsheng (**** Company) Park Gas Power Platform and Comprehensive Utilization of Synthesis Gas Project – Steel Structure Processing and Fabrication Project Location: Within the Hualu Hengsheng (**** Company) premises Funding Source: Self-funded Scope of Bidding and Division of Packages: Package Number, Name, Quantity (tons), Specifications Model A Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the coal grinding plant (702) and internal pipe corridors (0083); 2 sets, approximately 1,000 tons in total. See drawings and technical specifications for details. B Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the gasification unit (703) within the park gas power platform project; 1 set, approximately 600 tons. See component summary table and technical specifications for details. C Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the ash water treatment system within the park gas power platform project; 1 set, approximately 1,800 tons. See component summary table and technical specifications for details. D Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the sulfur recovery units (712A, B) and saturated monohydric alcohols (802) in the comprehensive utilization of synthesis gas project; 3 sets, approximately 1,100 tons in total. See component summary table and technical specifications for details. E Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the shift units (705A, B) in the comprehensive utilization of synthesis gas project; 2 sets, approximately 1,500 tons in total. See component summary table and technical specifications for details. F Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the low-temperature methanol washing units (706A, B) in the comprehensive utilization of synthesis gas project; 2 sets, approximately 2,800 tons in total. See component summary table and technical specifications for details. G Package: Steel structure processing and fabrication + anti-corrosion treatment (intermediate coat) for the acetic acid production unit (850) in the comprehensive utilization of synthesis gas project; 1 set, approximately 2,100 tons. See component summary table and technical specifications for details. Production Period: 45 days after the detailed drawings are approved; the shortest possible delivery time is indicated. 5. Budget amount: 74 million yuan