HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The 35KV substation for coking in Xuyang Zhongran Energy Co., Ltd.’s 3 million tons per year coking and hydrogen production integrated project has been successfully powered up

2022-07-05View Original

Thread Content

The 35KV substation for coking in Xuyang Sino-Prima Energy Co., Ltd.’s 3 million tons per year coking and hydrogen production integrated project was successfully powered up. Author/Source: Sinochem Second Construction Company. Date: July 5, 2022. Clicks: 15. On July 2, the 35KV substation for coking in this project was successfully connected to the power grid for the first time. The 35KV substation is one of the key projects of this initiative. Throughout the construction process, all tasks progressed smoothly; civil engineering work, line installation, electrical installations, and all other related tasks were subject to three levels of inspection, with a 100% pass rate. During the preliminary acceptance, final acceptance, and power-on acceptance, the project team addressed all identified issues in a high-quality and efficient manner, ensuring power supply as quickly as possible, which provided strong support for the smooth progress of subsequent stages. The successful power delivery marks a further solid step forward in the project’s development. It is reported that the project is located within the existing facility of Hohhot Xuyang Zhongran Energy Co., Ltd. in the coal chemical industry zone of the Qingshuihe County Industrial Park in Hohhot, covering a total area of 695,000 m2. The project plans to construct a coking plant with an annual capacity of 3.6 million tons. The coking process will utilize 4×65-hole, 6.78-meter-high single-hearth ramming coke ovens. The main construction elements include the coking plant, a synthetic ammonia plant with an annual capacity of 450,000 tons, and a PSA hydrogen production facility. Additional facilities include 2×260-ton-per-hour dry quenching units, systems for desulfurization and denitrification of flue gas from the coke ovens, gas purification units, storage areas for raw materials and products, coal receiving pits, and coke storage buildings – all of which are part of the utility and auxiliary infrastructure. The production capacity of the project is 3.6 million tons of dry quench coke and 450,000 tons of liquid ammonia per year. The by-products include 1.7 billion cubic meters of coke oven gas, 850 million cubic meters of hydrogen, 160,000 tons of coal tar, 50,000 tons of crude benzene, and 60,000 tons of ammonium sulfate. The total investment for the project is 4.8 billion yuan, of which 269.76 million yuan is allocated to environmental protection measures, accounting for 5.62% of the total investment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.