Thread Content
Bid Invitation for the Purchase of Medium and Low Pressure Equipment (Third Batch) for the Urea Unit in Phase I of the Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) Project of Jingyuan Coal Industry Group Liuhua Chemical Co., Ltd. Author/Source: Date: 2022-10-31 Clicks: 33 The Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) Project was approved for construction by the Economic Development Bureau of Baiyin High-Tech Zone via Document No. Bai Gao Xin Jing Fa Bei [2020]18. The project owner is Jingyuan Coal Industry Group Liuhua Chemical Co., Ltd., and the funding for the project comes from capital funds, shareholder loans, and other financing methods. (Please log in) Public bidding is being conducted for the procurement of medium and low-pressure equipment (third batch) for the urea unit in Phase 1 of this project. I. Project Overview 1. Project owner: Liuhua Chemical Co., Ltd., Jingyuan Coal Industry Group 2. Project name: Procurement of medium and low-pressure equipment (third batch) for the urea unit in Phase I of the Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) Project 3. Location: No. 201, Sujiadun, Dongxing Village, Wangxian Town, Baiyin District, Baiyin City, Gansu Province 4. Funding sources: equity capital, shareholder loans, and other financing methods 5. Project scale: The designed production capacity of the Jingyuan Coal and Electricity Clean and Efficient Gasification Gas Comprehensive Utilization (Relocation and Renovation) Project is 2×300,000 tons of synthetic ammonia per year, 2×350,000 tons of urea per year, 100,000 tons of methanol per year, 216 million m3 of (H2+CO) per year, 60,000 tons of melamine per year, 50,000 tons of urea solution per year, 50,000 tons of liquid CO2 per year, and 2,500 tons of catalysts per year. The project is implemented in two phases. The main components of the implementation include: production facilities such as storage and transportation of raw and fuel coal, two sets of powder coal gasification units, air separation systems, shift reactors, low-temperature methanol washing units, sulfur recovery systems, ammonia compression units, carbon dioxide compression units (for use in gasification and urea production respectively), liquid nitrogen washing units, syngas compression units, ammonia synthesis units, and urea production units (one newly built and one relocated) ; A set of PSA gas production, melamine, urea **solution**, methanol (relocation and renovation), catalysts and other related equipment ; The project includes three 280-ton/hour circulating fluidized bed boilers (equipped with desulfurization and denitrification systems), as well as various utility systems such as circulating water systems, water treatment systems, sewage treatment systems, reclaimed water reuse systems, and high-salinity water evaporation and crystallization salt separation systems. It also encompasses auxiliary facilities such as site layout and transportation arrangements (including a dedicated railway line to be connected from Yinguang Group and north-south logistics routes), storage and packaging facilities, power supply and distribution systems, telecommunications systems, monitoring systems, water supply and drainage systems, heating systems, a central control room, production facilities, and gates and fences ; Facilities such as cafeterias and bathrooms. II. Scope of the tender 1. The scope of the tender includes the design of the entire equipment, procurement of materials, manufacturing, testing, inspection, anti-corrosion coating (in accordance with the unified specifications for anti-corrosion coating of equipment and pipelines as detailed in the project design), acceptance, transportation (including packaging and delivery onto the site), insurance (prior to delivery and acceptance), guidance on installation and commissioning, technical training, after-sales service, spare parts, special tools, technical documents, and drawings, all the way until successful acceptance. In addition, it is necessary to meet the tenderer’s requirements for digital delivery in line with the \"Standards for Digital Delivery in Petrochemical Projects\" GB/T51296-2018 and the \"Unified Regulations for Digital Delivery of the Jingyuan Coal Electrification Gas Project\", including the provision of QR codes for equipment tracing. The specific scope of supply, work contents, and division of responsibilities are detailed in Appendix 8, \"Table of Scope of Supply and Division of Work Responsibilities,\" contained in Part 2 of Chapter 4, the Contract Terms. http://img.yf116.cn/image/img/20221031/1640146001428.jpg 2. Main technical requirements and basic parameters of the equipment to be bid for (for detailed technical requirements and parameters, see the assembly drawings). Bidders must meet the requirements specified in the bidding document ; For the equipment configuration (list of manufacturers and suppliers for main materials and components), please refer to the requirements regarding configuration and supply specified in the tender documents. 3. Quality requirements: The above equipment must comply strictly with the latest issued **, as well as relevant industry or local standards and specifications. In the event of any discrepancies between **, industry, or local standards, the highest standard shall apply. The quality of all purchased equipment must meet the requirements specified in the design drawings and relevant standards and specifications; the qualification rate of equipment materials must be 100%. In addition, the requirements for digital delivery set out in the “Standards for Digital Delivery in Petrochemical Projects” GB/T 51296-2018 and the “Uniform Provisions for Digital Delivery of the Jingyuan Coal Electrification Project” must be fulfilled, including the provision of QR codes for equipment tracing. 4. Delivery period: 6 months after the contract is signed. III. Qualification requirements for bidders: 1. Bidders must be manufacturers that are officially registered within the People’s Republic of China, possess independent legal person status, and have an effective ISO9001 quality management system certification. 2. Bidders shall have sound financial conditions and shall not be under orders to cease operations, have their assets seized or frozen, or be bankrupt. Bidders must provide financial statements audited by an accounting firm or audit institution for the past three years; if less than three years, they must submit financial statements from the time of establishment; and if less than one year, they must provide a credit certificate issued by a bank (original). 3. Performance credit requirement: The bidder must not be included on the list of entities with poor credit as published on the “Credit China” website (website address: www.creditchina.gov.cn). 4. Different entities that have the same person in charge of them, or that are in a holding or management relationship, shall not bid for the same bid section or for the same tender project that has not been divided into bid sections. 5. Joint bids are not accepted for this tender. IV. Qualification Review Method: This tender adopts a post-qualification review approach; bidders are responsible for determining whether they meet the requirements specified in the announcement and deciding whether to participate in the bidding. V. Acquisition of Tender Documents 1. The tender documents can be downloaded from *from 18:00 on October 28, 2022, to 18:00 on November 4, 2022 (please log in).