HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Daily Electrical Engineering Question (2018.08.23)

2018-08-23View Original

Thread Content

A power outage will cause damage to major equipment and result in the waste of a large quantity of products. The continuous production process will be disrupted, and it will take a long time to resume normal operations. When key enterprises experience a significant reduction in production, the level of electrical load for such cases is (). A. Class I load B. Particularly important loads among Class I loads C. Class II load D. Class III load

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.