This post was last edited by sdscj0122 on 2020-5-1 08:39. Wishing everyone a happy Labor Day! True or False questions based on the «Power Safety Work Procedures». Answer whether it is correct or incorrect; 3 points for a correct answer, 2 points for an incorrect one. A detailed explanation of the reason is worth 5 points. The step of checking and confirming the actual position of the circuit breaker (switch), isolator (disconnector), and grounding switch after operation does not need to be included in the operation ticket. Error
Reply #22020-05-01
Hello, moderator: Please include the word “electrical” in the title to prevent confusion and unnecessary inquiries.
Reply #32020-05-01
Error. After closing the equipment, check its position, which should be recorded in the operation ticket.
Reply #42020-05-01
Error. It is necessary to check and confirm the actual positions of the circuit breaker (switch), isolator (disconnector), and grounding switch after they have been operated, and these positions should be recorded in the operation ticket.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.