HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What to do if the fire separation distance between the equipment frame and the tank area does not meet the requirements

2012-05-15View Original

Thread Content

The distance between the hydrogen chloride synthesis framework and the storage tank area (classified as a Class A explosion-proof area) does not meet the 20-meter requirement. Can fire-resistant partitions be added to the open framework to solve this issue? However, the hydrogen chloride installation cannot be enclosed – what should be done?
Reply #22012-05-20
I consulted an expert in this field; for renovation and expansion projects, a firewall can be used to address this issue, but for new projects, the only option is to remove the storage tanks

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.