The issue of support loads on pipe racks in utility tunnels

2012-05-30View Original

Thread Content

There is now a question: fixed supports are installed on certain axes within the device’s internal ductwork, and the horizontal thrust on these axes is lower than that on other axes. But those familiar with the structure say that the columns and beams on other axes are arranged in the same way, meaning they can fully bear the load from the fixed frame. I wonder if that’s the case? Thank you!
Reply #22012-05-31
That’s indeed the case. That’s indeed the case with Banzhu. That’s indeed the case with Banzhu. Oh, the spotted bamboo
Reply #32013-06-05
After the pipeline is welded to the fixing frame, the horizontal thrust is absorbed by the frame; when designing the pipe galleries for the entire plant, we consider the fixing frame as a separate element. I recommend that you first have a stress specialist calculate the forces, and then have the structural engineering team verify them.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.