HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Several companies have developed space gasification furnaces in China

2012-06-05View Original

Thread Content

Several units for HT-L powder gasification have been put into operation, including those under construction; everyone is welcome to get involved!
Reply #22012-06-06
Seven 2.8-meter gasifiers are in operation: two in the first and second phases of Linquan, Anhui; one 2.8-meter gasifier in Puyang, Henan; two 2.8-meter gasifiers at Luxi Chemical; and two 2.8-meter gasifiers in Xinxiang, Henan. Under construction are a total of 4 3.2-meter gasification units in the first and second phases of Henan Jin Kai project, 1 3.2-meter gasification unit in Shandong Ruixing, 2 3.2-meter gasification units in Ningxia Baofeng, as well as other projects. The operation of space furnaces is now quite mature and stable, with relatively low consumption, offering good economic efficiency; the future of space furnaces looks promising.
Reply #32012-06-07
The space furnace is so amazing; it seems to be developing at a rapid pace.
Reply #42012-06-07
Space furnace, Huali four-nozzle – a source of pride for the Chinese people!
Reply #52012-06-08
Four facilities with a total of seven space furnaces are in operation, and all of them are currently running at full capacity. There are about 30 sets under construction, and the projects scheduled to be put into operation this year are Jin Kai and Rui Xing. The most obvious advantages of space furnaces are as follows: 1. There is a wide range of coal types that can be used; high-calorific, high-sulfur, and high-ash coals can all be burned, and no requirements are placed on their slurry-forming properties. The source of coal is crucial for the development of enterprises, and in the future companies should not be hindered by issues related to the origin of their coal supply ; 2. It has all the advantages of pulverized coal gasification (no need for further explanation) ; 3. It has a long operating cycle and low maintenance costs; the average continuous operating time per session is over 100 days, the service life of the burner can reach up to one year, and the maintenance costs are relatively low.
Reply #62012-06-08
Serial Number | Applying Unit | Product and Scale | Origin of Raw Coal | Current Stage
1 | Longyu, Puyang, Henan | 200,000 tons of methanol | Local | Commissioned in 2008
2 | Linquan, Anhui | 200,000 tons of methanol | Local | Commissioned in 2008
3 | Luxi, Shandong | 300,000 tons of synthetic ammonia | Local | Commissioned in November 2011
4 | Zhongxin Chemical, Henan Coal Industry | 300,000 tons of methanol | Local | Commissioned in September 2011
5 | Ruixing Chemical, Shandong | 300,000 tons of synthetic ammonia | Local | Under construction
6 | Jinkai Group, Henan | 1.2 million tons of synthetic ammonia | Local | Under construction
7 | Shuangyashan, Longmei Group | 300,000 tons of methanol | Local | Under construction
8 | Haoyuan, Anhui | 300,000 tons of synthetic ammonia | Local | Under construction
9 | Chengfeng, Ordos | 600,000 tons of synthetic ammonia | Local | Under construction
10 | Sichuan Gasification | Coal-to-gas for Lutianhua; Guxu mining area, Sichuan | Under construction
Reply #72012-06-08
Could you reveal the consumption levels of these factories? Are they profitable once they are in operation?
Reply #82012-06-08
Other projects under construction include Inner Mongolia Ely and Boyuan, among others
Reply #92012-06-30
If everything goes well, Henan Jinkai might be able to start operating vehicles by October this year
Reply #102012-07-01
Ah, the project in Shuangyashan has already been completed. Still bringing it up! ! However, the after-sales service for aerospace products is still excellent……

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.