HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Gas station process facilities

2012-06-28View Original

Thread Content

I have a small question for everyone. According to the \"Code for Design and Construction of Gasoline and CNG Filling Stations\" GB50156-2002, clause 5.0.1 stipulates that when the distance between the process facilities of a gasoline or CNG filling station and the buildings and structures outside the station is less than or equal to 25 meters, or less than or equal to 1.5 times the fire protection distances specified in Tables 4.0.4 to 4.0.7, a non-combustible solid wall with a height of not less than 2.2 meters should be installed on the adjacent side. What process facilities are included here? Are refueling units included? A beginner seeking sincere guidance!
Reply #22012-07-11
Process facilities include all equipment within fuel and gas stations, including fuel dispensers; for details, refer to Chapter 6 of the \"Code for Design and Construction of Automobile Fuel and Gas Stations\" GB50156-2002

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.