On the flow diagrams for both high-pressure and low-pressure water, the control valves are installed on the auxiliary lines. However, due to space constraints during piping, the control valves end up being installed on the main lines. What is the difference between controlling things this way and having them installed on the auxiliary lines?
Reply #22012-10-18
I don’t think there’s any difference; whether it’s installed in the main line or the auxiliary line, the temperature is controlled by adjusting the flow rate of the heating water through the heat exchanger.
Reply #32012-10-18
It should be the same in all cases. I’m not sure whether the diameter of the main and auxiliary pipes used by the poster is identical; when installing control valves, it is important to take into account the matching of their diameters with those of the process pipes, as well as the distance between the straight sections before and after the valve.
Reply #42012-10-18
As long as the diameter difference is not significant, it works the same whether it’s installed there or elsewhere.
Reply #52012-10-19
There is definitely a difference: the water flowing into the condenser encounters more resistance than the water flowing through the bypass line, so its efficiency is not as good as that of the water going through the bypass line. In our case, we have installations for both the main line and the bypass line.
Reply #62012-10-23
We also have main stories and side stories here. Generally, the auxiliary control valve is kept fully open, with the main control valve used for adjustment
Reply #72012-10-23
What scale of urea is the original poster planning to produce again?
Reply #82012-10-26
The plant under construction, 4070, is expected to start operating in December

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.