HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Boiler fuel gas pipeline

2012-10-25View Original

Thread Content

Dear sea friends, my gas pipeline has two pressure regulators. Is there any requirement regarding the distance between these two regulators? Are there any requirements for the straight sections before and after the flow meter? Mine is a DN32 pipeline; due to limited space, only 300 mm of distance is left between the two pressure regulation stages. I’m not sure if this will affect its performance I hope someone with experience can give some advice.
Reply #22012-10-26
This should have no impact. . . But the one we had before seemed to have a filter added between the two pressure relief valves. . .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.