HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Security Special Section

2012-11-22View Original

Thread Content

In oil pipeline projects, it was only after the construction drawings were prepared that it was discovered that the safety and health sections prepared during the feasibility study phase had not yet been reviewed. Do any experts have any suggestions on how to address this issue? If others say a re-review is needed, then what should be done with the dates and the standards used? Do you want the latest one? If it is changed to the latest standards and those used in the construction drawings, won’t it no longer be compatible?
Reply #22012-11-25
:'( . . Is really no one able to help?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.