How to recover the remaining HCL when discarding the converter?

2007-11-23View Original

Thread Content

This post was last edited by sunjl1981 on 2013-1-6 at 23:46. As we all know, after using a converter for some time, it may develop leaks; in such cases, it needs to be shaken to identify the leaks. But how can the remaining HCL inside the converter be completely recovered after shaking? If it’s just emptied, then over time quite a lot of resources are wasted. Does anyone have any good ways to deal with this? Please share your ideas. # &
Reply #22007-12-02
Under normal circumstances, gaseous HCl inside the converter is not recovered, as leaks in the converter lead to a sharp increase in the moisture content of the gaseous HCl within that converter; recovering it would cause more harm to the other converters. Moreover, if recovery were to take place, additional pre-treatment equipment would be needed for that HCl gas, resulting in higher costs. In my previous company, the HCl was absorbed using water and then sent to a dilute hydrochloric acid storage tank to be sold as waste acid
Reply #32008-01-05
We also wait until the converter temperature drops before opening it to allow hydrogen chloride to escape directly; the amount of hydrogen chloride gas in the catalyst and pipelines is not very large
Reply #42008-01-06
Our company simply discharges it directly, or dilutes it with water before sending it down the drain
Reply #52008-01-07
After the converter in our company is shut down, it is first purged with nitrogen; the sections containing high levels of VCM and hydrogen chloride are also purged with nitrogen and sent back to the system for recovery, a process that takes 3–5 minutes. The remaining portion is purified with nitrogen for absorption purposes, while the acidic wastewater is used to neutralize the waste alkali in the alkaline scrubber.
Reply #62008-01-07
After the converter in our company is shut down, it is first purged with nitrogen; the sections containing high levels of VCM and hydrogen chloride are also purged with nitrogen and sent back to the system for recovery, a process that takes 3–5 minutes. The remaining portion is purified with nitrogen for absorption purposes, while the acidic wastewater is used to neutralize the waste alkali in the alkaline scrubber.
Reply #72008-01-07
After the converter in our company is shut down, it is first purged with nitrogen; the sections containing high levels of VCM and hydrogen chloride are also purged with nitrogen and sent back to the system for recovery, a process that takes 3–5 minutes. The remaining portion is purified with nitrogen for absorption purposes, while the acidic wastewater is used to neutralize the waste alkali in the alkaline scrubber.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.