In Sichuan’s 09 installation quota, do the costs for the fabrication and installation of platforms need to be applied separately?

2012-12-17View Original

Thread Content

For example, what is the difference between CE2930 and CE2936? Do both need to be applied simultaneously during the production and installation of the execution platform? But for some device platforms, assembly is done on-site, without the need for pre-production before installation
Reply #22012-12-18
Does \"production\" refer to the manufacturing of materials?
Reply #32012-12-18
I remember it was calculated together; they are inseparable. Are you referring to the steel structure platform?
Reply #42012-12-19
In some provinces, a single quota is set for both manufacturing and installation; in Sichuan, however, separate quotas are assigned for installation and manufacturing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.