This post was last edited by you*n*nyou on 2012-12-18 at 14:23. Please share how much time it takes for the equipment in your facility to go from heating and purging to cooling and collecting liquid, and finally to producing qualified products ? What temperature is considered acceptable for long-term parking with heating and purging? Which point’s temperature is mainly being monitored?
It usually takes around 20 hours here; during the heating and purging process, the dew point is measured, and it’s roughly around -50 degrees!
It depends on the production process and the product; the equipment also plays a role. If everything goes smoothly, it will take us about 10 hours. The dew point is very important
It depends on the production process and the product; generally, it takes 30–36 hours. If the method of backflowing liquid oxygen is used, it can be more decisive.
It first depends on the acceptable dew point time, whether to start the system in cold or hot mode, and whether to use liquid nitrogen backflow. 30 hours is about right for us
A satisfactory dew point is the criterion for completing the purging process; it takes 36 hours to get our facility up and running after it has been fully thawed.
We usually keep it at 36 hours; the heating level is determined by the dew point, which is generally between 60 and 70. Of course, the higher, the better