http://www.sp.com.cn/kjzl/kjdt/200711270070.htm In order to speed up the promotion and application of IGCC power generation technology in our country, IGCC power station demonstration projects should be determined as soon as possible. * * Entrusted by the National Development and Reform Commission, China Electric Power Engineering Consulting Group Company organized and convened an expert review meeting for IGCC power station demonstration projects in Beijing from November 16th to 17th. Council consists of * * Zhao Yinong, deputy division-level researcher of the Energy Bureau of the National Development and Reform Commission, hosted the event, and Director Hao Weiping delivered an important speech. The meeting invited many well-known experts in the domestic power and chemical industries. Enterprises such as State Grid Corporation of China, Huaneng, Datang, Huadian, Guodian, China Power Investment and Guohua Electric Power all proposed their own application projects and introduced the application projects respectively at the meeting. The expert group carefully reviewed each application project in accordance with the principles of "independence, fairness, impartiality, and science". The review meeting was held on November 17 * * Finish. Can any hero guide the major power companies mentioned in the above news on how to apply for projects (location, scale, etc., the more detailed the better)? Many thanks
All 27 supporting documents required for approval of the demonstration project have been obtained, and the preparations for the demonstration project have been completed. The design and equipment bidding and awarding of the IGCC power station gasifier shell and internal parts, IGCC gas turbine, and IGCC power station air separation system of the demonstration project have been completed. The bidding for other major equipment, such as large compressors, steam turbines, generators and waste heat boilers, has been completed, and it is planned to complete the bidding in early December, thereby completing the bidding for all major equipment. Others can refer to: http://bbs.hcbbs.com/viewthread.php?tid=101550
China is still promoting the advantages of IGCC, etc., but as far as I know, there are currently some overseas* * IGCC projects have been banned. The possible reason is that it is not economically feasible.
Sorry, there may be something wrong with the format of my post. I will add it after sorting it out. I hope friends will pay attention to IGCC. This post was last edited by Lonely Tibetan Antelope on 2007-12-30 09:58 ]
latest news: The waste heat boiler and steam turbine system still need to be optimized, and are determined by the manufacturer, and the parameters are blank.
The most recent project is Dongguan Electrochemical Group, and I heard that Shenyang and other places are also conducting demonstrations.
There are so many, I don’t even know which ones are approved and which ones are being implemented.
The economic issue of IGCC will not be the reason for banning the development of IGCC. It is a premise that the unit cost and power generation cost of IGCC are higher than traditional pulverized coal power generation. Its advantages are cleanliness, less water consumption, less waste disposal, and the ability to comprehensively utilize coal resources. Therefore, IGCC is used in many* * Although the demonstration project is a money-losing business compared to traditional power generation, the key point is the significance