HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why can failing to completely remove the new tower oil lead to tower flooding?

2007-12-06View Original

Thread Content

I would like to ask why, during tower replacement in delayed coking, if the oil from the new tower is not completely removed, it can lead to flooding of the coke tower
Reply #22007-12-06
The new tower is generally preheated so that the temperature at its bottom exceeds 320 degrees. Under the operating pressure of the coke tower, most of the oil at the bottom of the tower after preheating consists of wax oil components. If these components are not removed completely, when oil and gas at a temperature of nearly 500 degrees enter the tower after switching to it, the wax oil components will vaporize in large quantities, which can lead to tower overpressure or the activation of safety valves.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.