HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What's your opinion?

2007-12-08View Original

Thread Content

For the longitudinal seams of the cylinder that are covered by reinforcement rings, 100% RT testing is required per standard specifications. However, the reinforcement rings were installed and welded before RT testing could be carried out. What methods can be used to meet the requirements without having to remove those reinforcement rings?
Reply #22007-12-08
A ultrasonic testing or radiographic testing will suffice.
Reply #32008-01-03
There’s no other way; it has to be made anew.
Reply #42008-01-04
Ultrasonic testing should work. . . No need to redo it

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.