Requirements for the installation of pipe supports and hangers

2007-12-08View Original

Thread Content

There are pipes with a diameter of 273 on the equipment, and these pipes run over long distances (about 20 meters) without any supports or hangers. Are there any standard requirements in this regard?
Reply #22007-12-08
20 meters. Is there a slope? Otherwise it will sag and water accumulation is likely to occur
Reply #32007-12-08
The pipeline runs out from the top of the equipment, descends vertically for 6 meters before splitting into three branches; each branch then extends another 8 meters in its respective direction. There are no supports or hangers installed along the entire pipeline
Reply #42007-12-08
It is preliminarily judged that the flexibility of the pipeline is acceptable, but load-bearing supports must be added. It is best to conduct a stress analysis before selecting an appropriate location for the support, and it is also necessary to consider whether the equipment is vertical or horizontal, as the thermal displacement of the pipe openings differs between these two configurations. For vertical equipment, a load-bearing support should be installed on the outer wall of the equipment near the pipe outlet to reduce the stress on the outlet; for horizontal equipment, it is necessary to find a way to install a load-bearing support on the floor slab. If the temperature is high, it is still recommended to conduct a stress analysis; spring supports are likely to be necessary, otherwise leakage may occur at the pipe flanges due to excessive stress.
Reply #52007-12-08
Take a look at SH 3073-2004-T, the Design Code for Supports and Hangers in Petrochemical Pipelines
Reply #62007-12-08
It has exceeded the allowable span requirement for pipes; supports should be installed
Reply #72009-04-07
The fourth floor mentioned it in a very professional manner; a stress analysis should definitely be conducted. A bracket should definitely be added
Reply #82009-04-09
If you need to design pipe supports and hangers, our company is a specialized manufacturer in this field – Yongcheng Pipe Support Co., Ltd. located in Sheyang County, Jiangsu Province. Peng Mingxing: 0515-82356556
Reply #92009-04-09
The bracket is definitely necessary; the description on the fourth floor was very professional. The load on the supports also needs to be determined based on the pipe wall thickness, medium density, insulation, etc. If it is a hot pipe, software should still be used to calculate the thermal displacement in order to determine whether a spring is needed.
Reply #102009-04-13
Yongcheng Pipe Rack Co., Ltd. in Sheyang County, Jiangsu Province, specializes in the production of spring supports and hangers. Peng Mingxing: 13914610011; Phone: 0515-82356556; Fax: 0515-82356116. It is a professional manufacturer that produces pipeline accessories as well as custom-made products for industries such as electricity, petroleum, chemicals, metallurgy, and machinery. The main products include: spring hangers, variable spring hangers, spring suspension hangers, constant-force spring hangers, hangers, pipe clamps, supports, pipe seats, long pipe clamps, three-hole short pipe clamps, two-hole short pipe clamps, vertical pipe clamps, creep measurement points, three-way displacement indicators, sprocket valve drive mechanisms, welded pipe seats, insulation manholes, dampers, circular dampers, square dampers, pipe sections, root sections, electric air locks, dual-core adjustable reducers, coal powder pipeline reducers, drive mechanisms, fan inlet bellows, disc spring hangers, support systems, flange screws, lugs, components for smoke, air, and coal powder pipelines (six types of components), as well as metal and non-metallic expansion joints. Our factory is equipped with complete processing facilities, boasts strong technical capabilities, and produces high-quality products.   Phone: 0515-82356556 Fax: 0515-82356116 Website: www.syycgj.com Address: Zhonglian Industrial Park, Economic Development Zone, Sheyang County, Yancheng City, Jiangsu Province
Reply #112009-04-14
The advertisement upstairs is way too excessive; the moderator should take action.
Reply #122009-04-14
The allowable span of a pipe is determined by factors such as the pipe’s wall thickness, diameter, the medium inside the pipe, and whether insulation is present. If the medium inside the pipe is a liquid and no insulation is used, the pipe is calculated based on stiffness considerations, with a maximum span of 11 to 14 meters. Therefore, if this pipeline has no support structures within a range of 20 meters in a horizontal direction, it certainly does not meet the regulatory requirements.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.