HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

I have a question regarding the sludge tanks in the hydrogenation units of refineries

2007-12-15View Original

Thread Content

The oil-contaminated tank in my workshop stores the light hydrocarbons discharged by the hydrogenation and hydrogen production units. The pump starts to operate once the liquid level rises to around 30, in order to drain the liquid. Due to the high content of hydrocarbons, the pump often gets clogged. I would appreciate it if anyone could offer some suggestions; thank you in advance! Our method usually involves opening the pump inlet drain valve; after draining a large amount of liquid, it can then be pumped out.
Reply #22007-12-15
Two suggestions: 1. Replace the pump – swap the sludge oil pump for one suitable for pumping light hydrocarbons. 2. Switch to nitrogen pressure delivery, using high-pressure nitrogen to force the oil in the waste oil tank out for loading.
Reply #32007-12-16
How light are light hydrocarbons? How does it compare to gasoline? It is recommended to use a submersible pump; that’s what we do in our factory
Reply #42007-12-24
Thank you, this information is very helpful to me
Reply #52007-12-24
What was said on the second floor is correct; our factory handles things in the same way, and it works well. Alternatively, an additional pumping line can be added to the oily waste tank so that the light hydrocarbons can be transported more quickly. And there will be no time to spare, but be sure to pay attention to the safe pressure setting of your oil tank.
Reply #62008-03-05
1 A reciprocating pump can be used, 2 nitrogen pressure can be used, 3 the tank can be pressurized
Reply #72008-09-03
May I ask: Does the vent on the underground oil tank discharge into the atmosphere or into the low-pressure gas pipeline network?
Reply #82014-10-20
We have on-site venting as well as lowering.
Reply #92014-10-20
We have on-site venting as well as lowering of the tiles; normally it should be connected up to the lower tiles
Reply #102014-10-20
If you decide to change to pressure transfer, you need to first check whether your oil tank meets the requirements for pressure vessels and whether all the safety accessories are present
Reply #112014-10-20
The inability to deliver the fluid might be due to the presence of light hydrocarbons, which results in insufficient pressure at the pump inlet. The simplest solution is to pressurize the tank; generally, two to three kilograms of pressure is sufficient. We have encountered this situation before

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.