HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Should the full-water condition be taken into account when checking the load capacity of the adsorption tank?

2007-12-15View Original

Thread Content

When performing load calculations for the foundation of the adsorption tank, should the condition of the tank being filled with water be taken into account? Steam is used for desorption, and the equipment is installed on the roof. . . This post was last edited by limingshuguang on 2007-12-17 09:05.]

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.