Thread Content
I'll write down the original text to see if anyone knows anything about it. The tagout of one of the 03C-200 compressors follows the site protocol of tagging all affected valves, and energy sources. However, the design of the relief system PSV valves require that the linkage that assures proper line up of PSV's to the flare must be broken to assure proper tag out. This post was last edited by ship200 on 2008-1-8 20:00 ]
It seems to mean what is marked, try to read it, and please weigh it according to the full text.: The tagout of one of the 03C-200 compressors follows the site protocol of tagging all affected valves, and energy sources. However, the design of the relief system PSV valves require that the linkage that assures proper line up of PSV's to the flare must be broken to assure proper tag out. Compressor 03C-20 One has all relevant valves and energy sources tagged according to the site (use) plan. However, the relief system PSV valve design requires ensuring the connection upstream of the PSV valve to the flare (process? ) Correct, make sure the (process) is labeled correctly
Log out and tag out is one of the construction site management procedures. Before system cleaning, purging and commissioning, the system needs to be isolated and recorded. Log out means to record the isolation status of all isolation points. ; Tag out is to mark the site with eye-catching signs and indicate whether the isolation status is on or off. The tagout of one of the 03C-200 compressors follows the site protocol of tagging all affected valves, and energy sources. However, the design of the relief system PSV valves require that the linkage that assures proper line up of PSV's to the flare must be broken to assure proper tag out. The isolation status labeling of each 03C-20 compressor should follow the uniform isolation status labeling principles on site, including all related valves and energy sources. However, the design of the relief system PSV valve requires that the connecting line from the PSV valve to the flare must be disconnectable to ensure proper isolation status marking.
Log out and tag out. Generally, American companies abbreviate LOTO, which in Chinese means tag out and lock out. It is the same as explained by the brother upstairs, which means that if maintenance is to be carried out, all energy points must be cut off, locked up, and signs must be hung to avoid problems.