How to organize engineering and technical data

2007-12-20View Original

Thread Content

Documents, drawings, charts, calculation materials, audio-visual materials and other materials generated during project construction from project proposal, preparation, exploration, design, construction to completion and commissioning, etc., all fall within the scope of collection, organization and archiving of completion data. The organization and archiving of engineering technical assurance data is one of the essential tasks in construction projects. Its importance is specifically reflected in the following aspects. 1. Engineering technical assurance data is a true reflection of the physical quality of the building. Regardless of the quality of construction raw materials, components, or sub-project quality assessment data, they must objectively reflect the actual construction conditions. 2. Construction project quality management is dynamically relevant, and engineering technical assurance data has become an important basis for pre-control. We can coordinate efforts based on data to accurately achieve quality goals. 3. Engineering technical assurance data is an important basis for determining the quality level of the project. The evaluation standards require that the engineering technical assurance information must be basically complete. Otherwise, it will be regarded as an unqualified project and cannot be delivered for use. 4. Engineering technical assurance data has become an indispensable technical basis for building renovation, expansion or addition of floors. Therefore, the compilation of engineering technical assurance data must be timely, true, accurate and complete, namely the following points ; (1) Timeliness Timeliness is the prerequisite for good engineering and technical assurance materials. Engineering technical assurance data is a true reflection of the physical quality of the building, so it is required that the data must be compiled in a timely manner according to the progress of the building construction. At the same time, timeliness is also reflected in the internal quality management of construction companies. “The quality management system of "self-inspection, mutual inspection and handover inspection" requires that engineering technical assurance data must be compiled in a timely manner. This is a "quality loop" that is strictly controlled during construction. Quality control, progress control and investment control require that engineering technical assurance data must be compiled in a timely manner to provide a reliable basis for control. social supervision agencies and * * Supervisory agencies also require construction companies to compile engineering technical assurance information in a timely manner to prepare for verification or approval of project quality levels. Therefore, the compilation of engineering and technical assurance data should eliminate procrastination, behind-the-scenes work, and a surprise mentality. (ii) Authenticity Authenticity is the soul of good engineering technology to ensure data. The collection of information should be realistic, objective and accurate, and do not hide the truth in order to "cut corners or save labor and materials" ; And don't distort the facts to "achieve a higher engineering quality rating." The compilation of all data should be synchronized with the construction process. Materials must have certificates and necessary test reports before use. A witness sampling and inspection system must be adopted, and the test should have witness sampling records. The quality assessment of sub-projects must be carried out on-site for actual measurement and inspection, and must not be forged behind closed doors. (iii) Accuracy Accuracy is the core of preparing engineering technical assurance data. The accuracy of engineering technology assurance information depends on the following aspects. The concept of acceptance batch should be clearly defined for concrete strength assessment, different divisions or construction sections should be distinguished, and statistical and non-statistical assessment methods should be correctly used. At the same time, in specific calculations, the average value of concrete strength is taken to one significant digit, and the standard deviation is taken to two significant digits. The filling in of sub-project quality assessment should be standardized. Ensure that the project content should be filled out in detail and specific, and cannot be generalized by "meeting the requirements" or "meeting the specifications". The grade of each sub-item of the basic project should be determined by the percentage of excellence, and should be explained in words, and should not be replaced by symbols as you like. The quality level of sub-projects shall be determined based on the percentage of basic items and allowable deviation items. (iv) Integrity Integrity is the basis for good engineering and technical assurance data. Incomplete information will lead to one-sidedness and an inability to systematically and comprehensively understand the quality status of unit projects. To ensure the integrity of the data, the following aspects of work should be done. 1. Special personnel should be assigned to collect relevant project information in a timely manner. 2. Relevant project data should be collected based on project quantity, batch size or batch number. 3. The general contractor should collect relevant information from subcontractors. In short, engineering technical assurance data must be basically complete. In addition to timeliness (premise), authenticity (soul), accuracy (core), and completeness (basis), it must also meet the requirements for the organization and preparation of completed drawings and data.: 1. The information must be fully signed, clearly written, of good paper quality, and kept neat and tidy. 2. The categories and items are clear, the cover, catalog, and list information are complete, arranged in an orderly manner, and coded page by page. 3. If the original drawings are used to prepare as-built drawings, the drawings must be at least 80% new, without oil stains or wear and tear, and the drawings and text must be clear, and a completion stamp must be stamped in the blank space in the upper right corner of the title bar before they can be used as as-built drawings. The compiler and technical person in charge of the as-built drawings should sign each one. 4. If there are major changes to the structure, form, or process, the construction unit shall draw as-built drawings according to the actual situation. If the design changes are not significant, the construction unit can modify the changed parts on the original construction drawings and stamp them with a completion stamp as the as-built drawings. 5. When organizing as-built drawings and other materials, they must be organized according to project project, professional category and drawing number, folded into the required format, and the title bar exposed for easy reference. 6. Important information such as drawings and hidden project records must be drawn and written in carbon ink. Reproduction and use of photocopies are prohibited. 7. Text materials should be based on A4 paper, leaving a 2.5 cm wide binding line on the left side, and binding with cotton thread.
Reply #22023-04-20
SH/T 3543-2017 and SH/T 3503-2017 batch generation tool link address: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=3596908&mobile=2

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.