HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

study* Pneumatic unit

2007-12-21View Original

Thread Content

I have just been transferred to a 3 million tons/year heavy oil catalytic unit to manage the pneumatic unit. The unit of my unit is composed of a 3M6 two-stage six-stage vertical centrifugal compressor manufactured by DR Company and an NG25/25 back-pressure steam turbine manufactured by Siemens. The unit is mainly used to increase the pressure of the rich gas from the fractionation tower, use 60 kilograms of steam from the waste heat boiler to do work, and discharge 10 kilograms of steam to the steam pipe network. Colleagues who know this aspect, please give me some guidance and provide me with some relevant information so that I can grasp this guy as soon as possible.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.