HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What is the difference between pre-feasibility study and feasibility study depth?

2007-12-24View Original

Thread Content

Experts, what is the difference between pre-feasibility study and feasibility study? Regarding the content and depth of the pre-feasibility study * * Is there a standard to follow. I only know the depth of feasibility research * * There are regulations, but no depth requirements for pre-feasibility studies were found. Please give me some advice.
Reply #22007-12-24
I wanted to post a request for help in the craft design exchange area. I first read the posting instructions, then clicked to post a new post, and found out that it was posted here. Sorry for being so busy with this forum. Please ask the moderator to help move the process design communication area.
Reply #32012-06-10
The Ministry of Chemical Industry originally did not have a pre-feasibility study, so there was no requirement for a pre-feasibility study. In fact, pre-research is equivalent to the depth of a project proposal. Towards * * Projects submitted for approval must be of a feasibility study depth.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.