Thread Content
General format and requirements of project feasibility study report 1. Project summary. A summary description of the project content, including project name, construction unit, construction location, construction period, construction scale and product plan, investment estimate, operating cost and benefit analysis, etc. 2. Necessity and feasibility of project construction. 3. Market (product or service) supply and demand analysis and forecast (quantitative analysis). Mainly includes analysis of the development status and prospects of the industry (or leading products) in the project area, existing production (business) capacity survey and analysis, market demand survey and forecast, etc. 4. The basic situation of the project undertaking unit (in principle, it should be a public institution with corresponding undertaking capabilities and conditions). Including personnel status, fixed assets status, existing building facilities and supporting equipment and equipment, professional and technical level and management system, etc. 5. Project site selection analysis. The project construction site selection must be intuitive and accurate. The specific plot location must be implemented and the basic conditions and construction conditions related to the project construction content must be implemented. The project construction location cannot be replaced by the project area. The specific content includes the specific address location of the project (a floor plan is required), project area, project resources, transportation, communications, transportation and hydrogeology, water supply, power supply, heating, gas supply and other conditions, other public facilities, location comparison selection, etc. 6. Analysis of production (operation, testing) and other process technology solutions. Mainly including project technology source and technical level, main technical process flow and technical process parameters, technical process and main equipment selection plan comparison, etc.; 7. Project construction goals (including production capacity goals or business capability goals to be achieved after the project is completed, engineering technology, process technology, quality level, functional structure and other goals of project construction), tasks, overall layout and overall scale; 8. Project construction content. The project construction content mainly includes civil engineering, field engineering, supporting equipment and equipment, etc. Each construction content and corresponding scale must be listed in detail one by one (classification and quantification). Civil engineering: describe in detail the name, scale and quantity, unit, building structure and cost of the civil engineering project. .The construction content, scale and construction standards should match the project construction attributes and functions. If it is a phased construction and has special reasons, it should be explained. Water, heating, electricity and other public projects and site projects should have a description of the project quantity and cost. Field projects: The current status of relevant projects at the construction site should be detailed Description, on this basis, explain the name, scale and quantity, unit, engineering method, and cost estimate of the new (continued) construction project. Supporting instruments and equipment: describe the specifications, model, quantity and unit, price, and source. For instruments and equipment with a single unit (set) estimated value higher than 50,000 yuan, the reason for purchase and Reasons and uses. For instruments and equipment with high technical content, it is necessary to explain whether they have the ability and conditions for use. Supporting agricultural (animal husbandry, fishery) equipment: describe the specifications, models, quantities and units, prices, sources and scope of application. For large agricultural (animal husbandry, fishery) equipment, the reason for purchase and purpose should be explained. 9. Investment estimation and fund raising. Based on the construction content and relevant construction standards or specifications, classify and summarize the fixed asset investment of the project in detail, and clarify the investment financing plan. 10. Construction period and implementation schedule. Based on the determined construction period and survey design, instrument and equipment procurement (or development), engineering construction, installation, and trial operation time and progress requirements, select the best implementation plan and progress of the entire project. 11. Environmental protection. Carry out harmless treatment of project pollutants, propose treatment plans, engineering measures, and costs. 12. Project organization, management and operation. It mainly includes the organization and management structure and functions during the project construction period, the organization and management structure and functions after the project is completed, the operation management model and operation mechanism, staffing, etc.; at the same time, it is necessary to conduct a new analysis of the operating costs, estimate the costs and expenses of maintaining the normal operation of the project after the project is completed, and propose reasonable ways and means to solve the required expenses. 13. Benefit analysis and risk assessment. Calculation and analysis (quantitative analysis) of the economic and social benefits after the completion of the project. In particular, quantitative analysis of the new fixed assets and development and production capacity after the completion of the project, as well as economic benefits, social benefits (such as the amount of social seed supply, how many farmers will be driven, how much regional economic development, etc.); 14. Relevant certification materials (certification of the legal person of the undertaking unit, certification of relevant supporting conditions or technical achievements, etc.). Various attachments, schedules, drawings and supporting certification materials should be true and complete. In addition, the cover requirements for the feasibility study report of the local project are as follows: Project name: Competent department: Responsible unit (chapter) Responsible unit person in charge and contact number: Construction location: Writing unit (chapter), personnel and contact number: