There are roughly two types of coke oven classification and main flue construction methods.: One is to build the reinforced concrete of the flue roof first, and then lay the flue lining bricks. ; The other is to lay the flue lining bricks first, and then pour reinforced concrete for the roof. Which one is more reasonable? The actual masonry process is usually the first one. Its purpose is to facilitate the fixation of the flue bend, and it can avoid the impact on the strength and reliability of the flue lining brick vault caused by first laying the flue lining bricks and then pouring the roof reinforced concrete. However, it may be a little troublesome in engineering. However, the advantage of the latter method is that it is step-by-step. As long as the masonry is done correctly, it may exceed the former in terms of construction period and quality. Which one is better, please discuss with colleagues. In addition, the construction of the coke oven's branch and main flue is generally listed as the final project of the coke oven, but most coke ovens are built first and then the coke oven body. This is an interesting phenomenon. This post was last edited by zf001 on 2007-12-28 09:58 ]
Reply #22008-08-14
I think this should be decided based on the on-site conditions, and the management staff should comprehensively consider the civil engineering and masonry projects. It is difficult to say which one is better and which one is worse.
Reply #32008-08-14
I think this should be decided based on the on-site conditions, and the management staff should comprehensively consider the civil engineering and masonry projects. It is difficult to say which one is better and which one is worse.
Reply #42008-08-14
I think this should be decided based on the on-site conditions, and the management staff should comprehensively consider the civil engineering and masonry projects. It is difficult to say which one is better and which one is worse.
Reply #52008-08-15
Based on the on-site conditions, management personnel should comprehensively consider civil and masonry projects and make decisions.
Reply #62008-11-09
It just needs to be carried out according to the drawings and the actual situation on site, and the quality must be ensured.
Reply #72021-06-27
Based on the on-site conditions, management personnel should comprehensively consider civil and masonry projects and make decisions.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.