Do cable pipe bridges in Grade A factory buildings need to be sealed?

2008-01-02View Original

Thread Content

Some time ago, I saw an oil pump room. The cables were laid in the cable bridge. Because there were too many pipelines, it was not suitable to pass through a single pipe. The bottom was not sealed. I checked the corresponding standards and found no relevant regulations. I wonder if this is reasonable? This post was last edited by limingshuguang on 2008-1-3 19:29 ]
Reply #22008-01-02
I don’t think it’s necessary! :handshake :handshake The protection of cables in explosion-proof areas should focus on joints and switches! Everyone is welcome to discuss this post. This post was last edited by mine at 2008-1-2 21:26 ]
Reply #32008-01-21
Yes, the electrical requirements are not very high and there is no need to wear pipes, but there must be no joints in the middle. I have consulted the electrical engineers we work here.
Reply #42008-01-26
There is no standard that says sealing is required, but for fire protection, sealing can play a certain role.; However, I think it has little effect. It depends on the actual situation of the company. If necessary, it is better to have a better sealing effect. This post was last edited by limingshuguang on 2008-2-2 14:38 ]
Reply #52008-01-28
There is no standard that says sealing is required. The emphasis is on joints and switches.
Reply #62008-01-30
I've seen a lot of chemical plants that are like this, so it shouldn't be a big problem.
Reply #72008-01-31
It is best to carry out fireproof sealing. . . The materials used must be fire-resistant. . . Our company is planning to engage in this project, but now I don’t know why there is no movement. . . . :L
Reply #82008-01-31
There are two types of cable directions in the factory. One is overhead, which is the overhead cable bridge that everyone is talking about now. The other is buried, which is running below the ground through underground protective casing. For the second type of cable direction, we must also consider the penetration of groundwater and the thickness of the frozen soil layer in winter, which must be below the frozen soil layer. Generally speaking, whether the overhead cable tray can pass through the factory building depends on the medium in the factory building, Class A medium. There is a distance requirement (10 meters) between the bridge and the equipment (tower, tank, etc.) with Class A medium. There is also a distance requirement for non-temperature pipes (it seems to be 5 pipe diameters).
Reply #92008-01-31
It is better to strictly carry out construction to avoid future troubles. The cables in our company's old installation were quite messy. There were many accidents where the cables and pipes were worn, causing gas leaks and fires in the pipes. Many hidden dangers of bridges wearing pipes were discovered. suggestion: 1. Cables must be routed on bridges and routed in a standardized manner. The bridges cannot be placed on pipes. ; 2. Stay away from valves and high-temperature pipelines (including pipeline heating in case of accidents) ; 3. Check the insulation regularly.
Reply #102008-01-31
It’s not necessary. Just make sure the connector is explosion-proof. The cable is originally designed to be explosion-proof. This post was last edited by limingshuguang on 2008-2-2 13:48 ]
Reply #112008-02-02
We didn't do it originally, but later during the inspection we were told it was necessary, so we re-sealed everything. But the inspection standards may be different in each place. It depends on whether your local safety inspection is strict or not. This post was last edited by limingshuguang on 2008-2-2 13:48 ]

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.