Thread Content
Our installation is undergoing maintenance this year. I would like to ask how I can do a good job as a technician.
Equipment overhaul, technicians should do a good job: 1. Equipment maintenance plan and effect acceptance 2. Key points of equipment maintenance 3. Schedule of equipment maintenance work
As a technician in device maintenance, you should do the following: 1. Comprehensively understand the current status of the device 2. Formulate an overhaul plan (funds, personnel, materials, time) 3. Prepare an overhaul plan 4. Implementation 5. Summary
There is a saying in engineering that technical clarification is not good, except that the problem belongs to your technician. After that comes the acceptance. Whether the quality of the inspectors is sufficient is also a problem.
System overhaul, as on-site technicians should do the following: 1. Understand the operation of the device in detail. 2. A detailed maintenance plan and construction plan (including personnel, tools, materials, time, etc.) should be made before construction. 3. Develop a detailed safety plan before construction to prevent safety accidents during construction. 3. During construction, we should pay close attention to the construction process, strictly control every detail, and control the quality during the process, so that the results can be guaranteed. 3. After you determine that the project meets the requirements, you should organize acceptance by relevant departments to further confirm whether the project meets the maintenance requirements. 4. Organize pressure test and drive.
For system maintenance, technicians should do the following things: 1. According to the daily operation of the system, determine the maintenance content, that is, the problems that need to be solved during this maintenance, including routine shutdown inspection of the system, and determine the spare parts that need to be replaced. ; 2. According to the system's allowed parking time, prepare a maintenance plan for the problems that need to be solved for maintenance and the system's regular parking inspection items. ; 3. Prepare the maintenance plan and commissioning plan. If the maintenance is done by an outside unit, it will be prepared by the unit responsible for the maintenance. You need to review it and communicate with the construction unit to determine whether the maintenance plan is feasible. The plan must stipulate the maintenance acceptance standards and formulate maintenance safety measures. The commissioning plan stipulates the start-up steps. ; 4. Before maintenance, check whether spare parts and materials are in place, and whether construction machinery and tools are in accordance with the maintenance plan. ; 5. After parking and before maintenance, conduct conversion analysis on equipment and pipelines with toxic, harmful, flammable and explosive media, and carry out maintenance after reaching safety permission. When there is a fire in the no-fire zone, follow the relevant regulations. This is very important for maintenance. ; 6. During maintenance, supervise construction personnel to strictly follow the maintenance plan. Each process will be transferred to another sequence after passing the inspection. ; 7. Conduct acceptance according to the acceptance standards. After passing the acceptance, organize the test run according to the test run plan.
The most important thing is people-oriented, reasonable and scientific management. At the same time, before on-site construction, make necessary technical briefings and arrange the construction progress of the construction unit, and conduct assessments according to their plans! Finally, we must give full play to the role of supervision! :handshake