How can I be a good engineer for Party A?

2008-01-04View Original

Thread Content

I used to be an electrical engineer in a production unit. Last year I moved to a newly built chemical company as an electrical engineer for Party A. I was mainly responsible for electrical issues during the construction process. When I took over, the first phase of the project was almost completed, and now the second phase of the project has begun. Since the project is relatively small, I didn't even review the drawings. Now I am asked to be responsible for the electrical work. I looked at the drawings and found that there were many mistakes (made by a small design institute, and there was no communication with Party A’s electrical personnel in the early stage). The design institute was not very cooperative in the later stage, and the construction team was also terrible. I asked experts for advice on how to complete such a project.
Reply #22008-01-04
If changes are made during construction, then ask the designer for approval: lol
Reply #32008-01-06
The main thing is to grasp the correct construction plan first to ensure that the project can be constructed smoothly. After the project is completed, go to the design institute and the construction company to settle the accounts one by one! ! !
Reply #42008-01-06
The owner has the right to request the design institute to make design changes to the project according to your ideas, require the design institute to issue modified design drawings, and the construction unit will implement them, and you, the owner, will implement project supervision and management and completion acceptance.
Reply #52008-01-07
Based on what you said, I think it should be done as follows. 1. Communicate with the designer. For design errors (violating design standards), the designer should send a written design modification order and ask the designer to issue a written design modification order. This is a reasonable requirement. If the design meets the standard requirements, there may be some inconvenient or unreasonable aspects that can be discussed with the designer to obtain a consensus. ; 2. For important design modifications, the designer will make another design modification explanation, and the construction unit will modify the construction plan according to the content of the design modifications. ; 3. For construction units with weak construction capabilities, process supervision and control must be strengthened. As you, you must first strengthen the supervision of raw materials to see whether the materials and equipment used by the construction unit meet the requirements, and then check whether each construction process meets the requirements of the acceptance specifications. You (on behalf of the owner) cannot sign for acceptance if the requirements are not met. ; 4. Strengthen the supervision of completion acceptance, including whether the project completion acceptance data and the physical quality of the project meet the acceptance specifications.
Reply #62008-02-01
You should have one or two technical seminars before construction... List all your questions. The technical providers of the construction party and design institute must be present until the problems are solved... The owner has the right to modify and express different opinions!
Reply #72008-02-01
After fully understanding the situation, there is no design institute that is so awesome in front of Party A.
Reply #82008-02-04
Obtain the support of the competent leaders and start from the economic point of view, that is, fines. Otherwise, no one will care about you. The design institute and the construction party are all involved, so it is mainly the leader. Your task is to keep the specifications in mind and require construction according to the specifications. Let everyone else do the rest.
Reply #92008-03-14
Simple, stop work, find the project manager of the construction unit, find the design institute
Reply #102008-03-14
First of all, you must communicate with the leader to gain understanding and let the leader understand the seriousness of the current problems and the solutions to the problems. Otherwise, you may be thankless for your efforts.
Reply #112008-03-14
Brother, you can only rely on yourself in this situation. This situation is too common in engineering. I am from an engineering company to Party A. I just want to say one thing.: Reasonably take care of the interests of both parties
Reply #122008-03-18
Nowadays, all projects must have a supervision company. I hope you can give the supervision company certain powers. The supervision company will control the quality and progress. Some things can also be solved by the supervision company for you. Otherwise, you will be very tired as the representative of Party A. Poor management of construction units is a common problem in China now.
Reply #132008-03-19
One is doing public relations work and the other requires senior management to come forward for coordination.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.