HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions about pipe fittings

2008-01-06View Original

Thread Content

Teachers, my catalytic device is relatively old, and the pipelines are all insulated with warm pulls. I would like to know how to tell whether there are reducing pipes in the pipes without removing the insulation. Thank you!!
Reply #22008-01-06
You can refer to the specifications of the nearest valves at both ends of the pipeline:handshake:handshake
Reply #32008-01-07
Haha, who can tell this clearly? I can only look at the drawings. The judgment of pipe fittings may not be very accurate, even the drawings sometimes have changes. But don’t remove the insulation, just look at the drawings carefully and ask the experienced employees for advice! ·! ! !
Reply #42008-01-07
Digging a small hole in the insulation to test it is more effective.
Reply #52008-01-07
If you don't open the insulation layer, you need to carefully look at the as-built drawings, and see if there are any changes during the construction phase, and then ask the master for advice.
Reply #62008-01-07
This is a method, but it is not easy to be sure if there are multiple branch pipes on site. It's best to look at the drawings.
Reply #72008-01-07
Haha, don’t dig holes everywhere, the boss will think you are attracting bugs! ! ! ! Digging holes is not a good idea. Digging a small hole is easier for confirming thin pipelines. Can you tell the difference between DN300 and DN400 by digging a small hole? ;P ;P ;P It is better to look at the drawings and ask an experienced employee if it is feasible! !
Reply #82008-01-09
You can make a simple tool and use a probe to penetrate the insulation layer to indirectly calculate the thickness of the insulation. This is accurate and does not require removing the insulation layer.
Reply #92008-01-09
I also encountered this problem when I entered the factory, and I still haven’t figured out what happened to the pipelines inside. After entering the factory, I spent a month working on the process and gained nothing at all. A month later, the old equipment completely ended its mission. I was also transferred to a newly built equipment as an operator. After a year, I was promoted to a technician. To this day, I still don’t understand how the pipelines in the old equipment are arranged: lol :lol

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.