This post was last edited by sunjl1981 on 2013-1-6 22:47. Does anyone know about the situation of Xinjiang Tianye’s 400,000 tons caustic soda project? # , , &
I heard that it will be put into production in 2008, using dry acetylene technology.
Their second phase is also 400,000 tons, right?
The first phase of 200,007 has been put into production by the end of the year. Acetylene is all produced by dry process. The synthetic fluidized bed grinder is finished.
The 400,000-ton project is being constructed in two phases. The first phase of 200,000 tons has been successfully put into operation, and the second phase is planned to be put into operation in 2008. All acetylene uses dry acetylene equipment, and its 400,000 tons is equipped with cement production equipment. The polymerization uses a 105M3 polymerization kettle.
I will graduate soon and go to Tianye Shi*
Tianye has done a good job and I am their old friend. Driving aggregation was a little unstable at the end of the year, but it’s much better now and the system is relatively stable.
I am from Xinjiang Tianye, but now I am doing wet acetylene and dry process is very successful. The masters there are all transferred from us.
The one upstairs belongs to Tianye. Your company is in the new place.
Xinjiang Tianye is located in Shihezi City, Xinjiang. Its 400,000-ton project is being constructed in two phases. The first phase of 200,000-ton project was successfully put into operation at the end of 2007, and the second phase is planned to be put into operation in 2008.
Tianye is one of the companies that exploits and cruelly exploits its employees. I have been with Tianye for more than ten years, and I never took a full break during holidays. I worked overtime without overtime pay. I couldn't bear it, so I left.
Xinjiang Tianye’s dry acetylene seems to have many problems.
Congratulations on being out of the sea of suffering~~I don’t know which branch of the acetylene workshop you are in?
The construction site of Xinjiang Tianye’s 400,000-ton polyvinyl chloride project is located in Tianye Chemical Park, North Industrial Zone, Shihezi City. It's us who are really * place. 400,000 tons of polyvinyl chloride, 300,000 tons of ion membrane caustic soda, 640,000 tons of calcium carbide, 2×2,000 tons/day calcium carbide cement equipment and its own dedicated railway line. The 400,000-ton polyvinyl chloride plant uses dry acetylene, a large vinyl chloride fluidized bed and a 105m3 full flow jacketed polymerization reactor. These new technologies are developed and utilized.
I heard that Tianye’s acetylene workshop has had some problems recently. Is it true?
Are there any brothers from Tianye? Can you provide the operation status of the 110 full circulation polymerization kettle? Thank you!