1. Issuing and accepting operation tasks: The on-duty dispatcher issues dispatching commands based on the maintenance application and operation mode arrangements, and explains the purpose of the operation and relevant precautions. 1. After hearing the dispatch call, you should first start recording and answer the call. 2. Both parties report each other’s units, exchange names, and use scheduling terminology. 2.1. Monitor on duty: I am the shift leader (main duty officer) of XXX substation XXX ; 2.2. Ask and read back the name of the unit and dispatcher who issued the dispatch order. 3. When issuing operation tasks: The voltage level should be clearly defined, dual names should be used (for equipment with dual names), scheduling terms should be used, and operating tasks and equipment status transitions should be described in detail. 4. When the assignee accepts the task, he should record the order time, dispatcher unit, name, and operation tasks neatly in the operation record book while listening, and recite the records to check. If there are any questions, he should take the initiative to check clearly. 5. After receiving the order, turn off the recording phone. 6. The shift leader (main duty) shall assign qualified guardians and operators according to the requirements of the operation tasks. 7. The shift leader (main duty), guardian and operator walk together in front of the simulation diagram, stand in position, and compare the simulated wiring. The person in charge of the shift will comprehensively and detailedly arrange the operation tasks according to the current operating mode and equipment status, explain the purpose of the operation, and explain the key points of the work and safety precautions, including: The grounding switch (grounding wire) that should be closed (assembled and disassembled), the status transition of the equipment, and the status of protection operation and withdrawal. 8. For operations that only require protection and withdrawal, the shift leader (main duty), guardian and operator should walk together to the protection screen where operations are not allowed. The person in charge of the shift will arrange the operation tasks in full detail and explain the key points of the work and safety precautions. 9. For a single operation, the shift leader will designate a guardian and operator. The guardian and operator will stand opposite the shift leader. The shift leader will arrange the operation tasks in full detail and explain the key points of the work and safety precautions. 10. For the operation of non-dispatching equipment, such as the regular switching of station power, the start and stop of transformer coolers, the operation of changing station power and DC system operating modes, etc., the shift leader (main duty) should assign detailed operating tasks to the operators, use double numbers when assigning tasks, explain the purpose of the operation and the operating status of the equipment, and fill in the operation ticket as required. The above content should be recorded in the operation record book in detail. 11. The operator repeats the operation tasks loudly, and after the person in charge on duty and the guardian confirm that they are correct, the person in charge on duty orders the preparations before the operation. 2. Fill in the operation ticket 1. The operation ticket is filled in by the operator based on the operation tasks, the operation mode and usage status of the equipment system. 2. When the operator fills in the operation ticket, he should use the operation ticket according to the sequential number. 3. When filling in the operation tasks, dual names should be used, and the equipment status transition should also be filled in. 4. The operation ticket must be filled out in neat and clear handwriting, and keywords (such as pull, close, throw, stop, send, return, install, dismantle and double names) must not be altered. 5. According to the implementation management regulations of the "Hazard Factor Control Measure Card" of the operation project, the "Hazard Factor Control Measure Card" should be filled in for the following operations:": 5.1. Stop and power supply operations of main transformers of 110KV and above ; 5.2. Stopping and powering on busbars of 10KV and above ; 5.3. Operation of all side belts and string belts at 10KV and above ; 5.4. Bus switching operation of 10KV and above and other complex switching operations ; 5.5. System merging and delisting operations ; Loop line closing and unlooping operations. 3. Review and verification of operation tickets 1. After the operator fills out the operation tickets, he first conducts a self-examination with reference to the typical operation tickets and the simulation diagram. 2. If a mistake is found, a "void" stamp should be stamped. The "void" stamp should be stamped in the upper right corner of the "Operation Task" column of the operation ticket. At the same time, indicate the reason for the invalidation in the remarks column and sign, and then fill in the ticket again. 3. After the operator self-examines the operation ticket and it is correct, submit it to the guardian for review. If the guardian finds an error in filling in the ticket during the review, he should immediately hand it over to the operator to stamp "voided" and fill in the ticket again. 4. After the operation ticket is reviewed and found to be correct, the operator and guardian will conduct a simulation rehearsal together. 5. For large-scale operations and particularly complex operations, they should also be submitted to the shift leader or station manager for review. 6. Simulation rehearsal 6.1. Under the supervision of a guardian, the operator takes out the computer key and checks its integrity. 6.2. The guardian holds the operation ticket, and the operator holds the computer key and stands in front of the simulation disk (referring to the position where the guardian can fully monitor the operator's behavior). 6.3. The operator places the computer key next to the simulation disk for easy use, and then turns on the power switch of the simulation disk. When the simulation disk displays correctly, the simulation preview can be performed. 6.4. The guardian holds the operation ticket and sings the votes item by item. The voice is required to be loud, clear and accurate. 6.5. Operate your fingers and watch the corresponding equipment on the simulation diagram repeat, with a loud and clear voice. 6.6. After the guardian has verified that everything is correct, he will issue the "Yes, Execute" order. 6.7. The operator changes the status and position of the corresponding equipment on the simulation diagram according to the guardian's command. guardian: Check that the XXX switch is indeed turned on. After the operator pulls it off,: The XXX switch has been turned on. 6.8. The operation steps that cannot be demonstrated on the simulation disk should also be carried out in the order of operations. The guardian should order and the operator should repeat them. 6.9. After the simulation rehearsal, if the operation is changed or the operation task is cancelled, the simulation diagram should be restored to its original state immediately. 7. After the simulation rehearsal confirms that the operation ticket is correct, the guardian will stamp the "Blank Below" stamp in the space under the operation item, and then the operator and guardian will sign. 8. The guardian reports to the shift leader (chief duty) that the simulation rehearsal is correct and submits it to the shift leader (chief duty) for review and signature. 9. After the operation ticket is verified and signed correctly, the guardian should place the operation ticket in a special folder for operation. 10. The operator and guardian go to the safety equipment room together to prepare qualified safety tools.: 10.1. Check whether the insulating gloves are in good condition ; 10.2. Remove a certain ground wire according to the ticket and check whether it is intact ; 10.3. Check the electroscope ; 10.4. Take out qualified operating rods or insulating partitions as needed ; Note: After the safety equipment is prepared, it should be placed in the safety equipment room and does not need to be taken to the main control room. 11. When everything is ready, the guardian will report to the shift leader and wait for the operation. guardian: Shift leader, operational preparations are ready and ready for operation. 12. The shift leader reports to the dispatcher: The XXX operation ticket is ready and can be operated. Check the main operation items with the dispatcher if necessary. 4. Issuing and receiving operating commands 1. Start recording, answer the phone, and proactively report your station name and name. shift leader: I am XXX, the shift leader of XXX substation. 2. When the shift leader accepts the operation order issued by the dispatcher, he will neatly record the time of issuing the order, the issuing unit, name, and operation tasks in the operation record book while listening, and recite and check the records according to the records. 3. After receiving the order, turn off the recording phone. 4. The receiving person will fill in the name of the issuer in the issuer column of the operation ticket, and the order time in the command operation time column of the operation ticket. 5. The shift leader issues operating orders to the guardians and operators, and explains the key points of the operation, the dangerous factors in the operation, and the safety precautions related to the operation (including: Before closing the knife switch, check that the switch is in the off position ; Check that there is no ground wire and grounding switch on the busbar ; Joint jump protection pressure plate ; When hanging the ground wire, attention should be paid to keeping a certain distance between the grounding soft conductor and the human body, etc.). 6. The operator repeats the operation tasks loudly, and starts the operation after the duty leader and guardian confirm that they are correct. 5. Switching operation 1. Under the supervision of a guardian, the operator inputs the operation items into the computer key, and checks that the simulation panel display and computer key LCD display indicate correctly. 2. The guardian carries the operation ticket and keys, and the operator carries the operating tools and equipment, and the ground wire starts the operation (if operating secondary equipment, there is no need to bring computer keys and tools, etc.). 3. The guardian and operator should walk to and stand in front of the equipment being operated in the order of the operation items. 4. Operating standards: 4.1. Guardians and operators jointly check the equipment name, number and operating status ; 4.2. After checking that everything is correct, the guardian and operator should stand in place and prepare for the operation. ; 4.3. The guardian will hand over the key to the operator to unlock, and the operator will unlock according to the operating instructions (three comparison principles should be followed when unlocking): Compare the equipment number, the lock number, and the computer key display number. The three numbers should be consistent) ; 4.4. After unlocking, the key should be returned to the guardian in time before performing the switching operation procedure. ; 4.5. The guardian should sing the votes loudly according to the operation items. The voice is required to be loud, clear and accurate. ; 4.6. The operator operates the equipment number with his finger and repeats it loudly. After the guardian checks that it is correct, he issues the command "Yes, execute". The operator can only proceed with the operation after three seconds of thinking and correctness. 5. After each operation, the correctness and quality of the operation should be checked together. 6. After the inspection is good, the operator immediately locks the lock, and the guardian puts a "√" on the left side of the operation item. 7. For the first, last and important items (including closing the circuit breaker, switching on and off protection, installing and disassembling the ground wire or closing the grounding switch), the actual operation time should be filled in the "Operating Time" column on the right side of the item. The general operation items in the middle do not need to fill in the operating time. 8. After all operation items are completed, the guardian and operator should conduct a review together to prevent missing or wrong items. 9. After the inspection is correct, the guardian reports the operation execution status to the shift leader. 10. How to deal with questions or exceptions during operation: 10.1. During operation, if the guardian or operator has any questions about the operation or finds any abnormality, the operation should be stopped immediately. 10.2. It must be reported to the shift leader immediately. It is strictly prohibited to change the operation ticket without authorization, and it is not allowed to release the locking device at will. 10.3. After on-site inspection and confirmation by the on-duty supervisor, the work shall be carried out in accordance with the requirements of the "Electrical Safety Work Regulations" and the "Supplementary Regulations on the Implementation Procedures for Electrical and Line Operation Tickets and Work Ticket Systems". 10.4. If necessary, report to the webmaster and set up a second guardian. After the doubts or abnormalities are identified and eliminated, the second guardian can assist in the operation, but the first guardian should always be in the position of guardian. 11. Unlocking operation to prevent accidental locking: 11.1. When the accidental locking prevention device becomes abnormal during operation and cannot be operated, the operation should be stopped immediately and reported to the person in charge on duty. 11.2. The shift leader should go to the site to check and confirm that it is not due to improper use. According to the operation tasks and unlocking approval authority, the unlocking operation can only be done after requesting and approving. 11.3. A second guardian must be set up for the unlocking operation. The shift leader for single-circuit unlocking operation can be the second guardian, and the station leader for large and complex operations can be the second guardian. Without the presence of the second guardian, the operator and guardian are not allowed to operate without authorization. 11.4. After the unlocking operation is completed, the person in charge on duty should immediately record the time, content, and approver of the unlocking in the anti-accidental locking record book, and seal the unlocking key. 11.5. Under the supervision of a guardian, restore the simulation diagram according to the actual situation on site, re-simulate the rehearsal, and operate according to the procedures determined in this section. 6. Reporting, Stamping and Recording 1. Start recording, answer the phone, and proactively report your station name and name ; shift leader: I am XXX, the shift leader of XXX substation. 2. Report the end time of the operation task to the sender. 3. For equipment under the jurisdiction of the central dispatch, the local dispatch should be reported immediately after the intermediate dispatch is reported. 4. Turn off recorded calls. 5. Fill in the operation completion report time on the operation ticket and stamp the "Executed" stamp in the upper right corner of the "operation task bar" of the operation ticket. 6. Record the reporting time, name, unit, operation tasks and operation ticket number of the person receiving the report in the "operation record book". 7. Guardians and operators put the tools used in the operation back to their original places.