HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Analysis of the consequences of the filler tower height being higher than the original design.

2008-01-13View Original

Thread Content

The packed tower was originally designed to be 10 meters tall, but since our factory already has an 18-meter tall packed tower available, we used that one instead. What impact will this have?
Reply #22008-01-13
The direct issue is the high pressure drop, but other factors require clarification before a tower can provide an answer.
Reply #32008-01-14
It may improve the separation capacity of the column, but this depends on the specific structure of the column, such as changes in the height of the distillation section and the stripping section.
Reply #42008-01-14
What will happen if both the height of the stripping section and the rectifying section are increased? Will the performance improve, or will energy consumption become too high?
Reply #52008-01-14
What impact will it have? Are there any specific data to illustrate this?
Reply #62008-01-18
How many sections are there in the packing inside a 18-meter tower? What was the original design for the packing, what is the diameter of the tower, and what type of distributor is used? What was the diameter of the tower used later on, and what kind of packing was used? What type of distributor was that? :@ This post was last edited by Aishiben on 2008-1-18 09:50
Reply #72008-02-02
Generally, it depends on the pressure drop requirements of the process; if those requirements are high, the pressure drop increases
Reply #82008-02-03
If the operating conditions remain unchanged, the quality will be higher.
Reply #92008-02-03
It’s necessary to analyze each case on its own; the conditions provided by the original poster are too simplistic.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.