HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why is it that every time PDMS creates a pipe fitting, it prompts whether the pipe grade has changed?

2008-01-14View Original

Thread Content

This post was last edited by qq375170364 on 2009-6-16 14:48 My tubes are all of the same level. It prompts every time. It’s so annoying.
Reply #22008-01-15
Just set it once during system settings.
Reply #32008-01-15
Can Jasmine still be modified?
Reply #42008-01-15
When defining the default material type, select OK. Try it?
Reply #52009-06-15
Select the grade when you first create the pipe. If you select it correctly and it still prompts when you draw, it may be that the grade of the pipe has changed during the drawing process.
Reply #62009-06-15
The one you selected is not the same type as the default one at the beginning. Just change it.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.