Pipe welding construction measures in winter

2008-01-16View Original

Thread Content

When constructing pressure pipelines in winter, the standards and specifications are not uniform. What measures should be taken for welding in the north?
Reply #22008-01-16
When welding pipelines, the welding area should be protected from severe weather. When the ambient temperature is low, appropriate measures (such as preheating, warming, and heating) should be taken to ensure sufficient temperature required for welding. The welding rod should be dried and placed in an insulation barrel. When welding outdoors, if the wind force is greater than Level 4, a windproof barrier should be installed, and a rain shelter should be installed in rainy and snowy days.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.