What content should generally be included? Need a quote or something?
Generally, it includes background, process route, market analysis, manufacturer, price analysis, conclusion, etc.
600,000 tons/year olefins project feasibility study report Volume 1 General Summary File No.: 07051-FP08-01 Preparation: Check: Approval: Contents Chapter 1 General 1.1 Overview 1.1.1 Project name and sponsor 1.1.2 Basis for preparation 1.1.3 Principle of preparation 1.1.4 Project background 1.1.5 Owner profile 1.1.6 Purpose and significance of project construction 1.1.7 Project construction scope 1.2 Research conclusions and suggestions 1.2.1 Brief comprehensive conclusion of the study 1.2.2 Existing problems and suggestions Chapter 2 Market analysis and price forecast 2.1 Overview 2.2 Market Analysis 2.3 Price Forecast Chapter 3 Product Plan and Production Scale 3.1 Product Plan 3.2 Production Scale Chapter 4 Total Process Flow and Device Composition 4.1 Selection of Raw Material Route 4.2 Whole Plant Device Composition and Production Unit Series Configuration 4.3 Process Technology and Source 4.4 General Process Flow Description 4.5 Whole Plant Process Overall Flow Chart and Total Material Balance Chapter 5 Automatic Control Technology Plan 5.1 Whole Plant Automatic Control Level and Main Control Plan 5.1.1 Overview 5.1.2 Level of self-control 5.1.3 Main control scheme 5.1.4 Communication network 5.1.5 Safety and protection measures 5.2 Determination of instrument selection 5.2.1 Selection principles 5.2.2 Control room monitoring system 5.2.3 Field instruments 5.3 Power supply 5.3.1 Instrument power supply 5.3.2 Instrument air source 5.4 Instrument repair workshop 5.4.1 Workroom setting 5.4.2 Maintenance Equipment Selection Chapter 6 Supply of Raw Materials, Fuel and Auxiliary Materials 6.1 Supply of Raw Materials and Fuels 6.1.1 Specifications and Quantities of Raw Materials and Fuels 6.1.2 Sources of Raw Materials and Fuels 6.2 Supply of Auxiliary Materials 6.3 Supply of Public Works Chapter 7 Factory Construction Conditions and Site Selection 7.1 Factory Construction Conditions 7.1.1 Physical Geographic Overview of the Factory Site 7.1.2 Local Social and Economic Conditions 7.1.3 External Transportation Conditions 7.1.4 Water source status 7.1.5 Power supply 7.1.6 Natural gas resources 7.1.7 Coal resources 7.2 Site selection Chapter 8 Energy 8.1 Energy consumption indicators and analysis 8.2 Summary of energy saving measures Chapter 9 Environmental protection 9.1 Current status of the site and regional environment 9.1.1 Site location and topography 9.1.2 Climatic characteristics 9.1.3 Hydrogeology 9.2 Pollutant emission standards for project implementation 9.2.1 Environmental quality standards 9.2.2 Emission standards 9.3 Main pollution sources and pollutants 9.4 Environmental protection and treatment measures 9.4.1 Waste gas 9.4.2 Wastewater 9.4.3 Solid waste disposal measures 9.4.4 Noise 9.4.5 Greenhouse gas CO2 emission reduction measures 9.5 Investment in environmental protection facilities 9.6 Preliminary analysis of environmental impact Chapter 10 Occupational safety and labor hygiene 10.1 Design basis 10.2 Labor safety and occupational health standards adopted in the design 10.3 Analysis of occupational hazard factors in the production process 10.3.1 Fire and explosion hazards and toxicity 10.3.2 Coal dust hazards 10.3.3 Hazards of chemical corrosion 10.3.4 Noise hazards 10.3.5 Hazards of static electricity and lightning 10.3.6 Hazards of accidental injuries and chemical burns 10.4 Preventive measures taken in the design 10.4.1 General layout design 10.4.2 Electrical and automatic control safety design 10.4.3 Measures to prevent misoperation during production 10.4.4 Preventive measures against dust poisons 10.4.5 Preventive measures against chemical corrosion 10.4.6 Noise prevention measures 10.4.7 Preventive measures against accidental injuries from machinery and falling 10.4.8 Measures against burns 10.4.9 Safety colors and safety sign design 10.5 Labor safety and health agency setup and staffing 10.5.1 Institutional setup and staffing 10.5.2 Labor safety and health education system 10.6 Special investment in safety and health Chapter 11 Fire protection 11.1 Design basis and standards and specifications 11.2 Fire hazard category of the project 11.2.1 Project introduction 11.2.2 Production process characteristics 11.2.3 Main hazardous material characteristics 11.2.4 Device fire and explosion risk analysis 11.3 Fire protection measures 11.3.1 Process fire protection design 11.3.2 General plan fire protection design 11.3.3 Building fire protection design 11.3.4 Lightning protection and anti-static 11.3.5 11.4 Fire protection facilities 11.5 Fire station 11.6 Fire protection investment estimate Chapter 12 Factory organization and labor capacity 12.1 Factory management system 12.2 Whole factory capacity 12.3 Personnel Source and Training Chapter 13 Project Implementation Plan 13.1 Project Cycle Planning 13.2 Implementation Progress Planning Chapter 14 Investment Estimation 14.1 Project Overview 14.2 Basis for Preparation 14.3 Investment Analysis 14.4 Other Matters Needing Explanation 14.5 Investment Estimation Chapter 15 Financial Analysis 15.1 Basic Data 15.2 Sales Revenue Estimation 15.3 Cost Estimation 15.4 Financial Analysis 15.5 Uncertainty Analysis 15.6 Financial Analysis Summary Financial Analysis Schedule: Attachment 1 Main indicators of financial evaluation table Attachment 2 Source and application of funds table Attachment 3 Fixed assets depreciation, intangible and other assets amortization estimate form Attachment 4 Annual total cost and expense table Attachment 5 Liquidity estimate table Attachment 6 Sales revenue and sales tax estimate table Attachment 7 Profit and loss statement Attachment 8 Borrowing principal and interest payment calculation table Attachment 9 Financial plan cash flow statement Attachment 10 Balance sheet Attachment 11 Financial cash flow statement (full investment) Attachment 12 Financial Cash Flow Statement (Owned Funds) Attachment 13 Sensitivity Analysis Table Attached Chart: Serial number Drawing name Number of drawings 1 Area location diagram 07044-FP08-01-01 1 2 General layout diagram 07044-FP08-01-02 1 3 Overall plant material flow diagram 07044-FP08-01-03 1 4 Whole plant water balance diagram 07044-FP08-01-04 1 5 Whole plant steam balance diagram 07044-FP08-01-05 1 Is this a researchability report? I will send you a catalog. It may be helpful for you to take a look!
Thank you, that’s it, especially #3 is so detailed! ! praise! !