HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Workshop column empty standard

2008-01-18View Original

Thread Content

I majored in chemical engineering and am currently designing a new workshop, but I don’t know much about civil engineering. I would like to ask for your advice.: We are a reinforced concrete workshop. Is there a certain standard for the column clearance in the workshop? For example, the ones I see now are 6m, 7.5m, 8m, and 9m. Are larger column clearances still used? What books should I read in this area? Thanks!
Reply #22008-04-18
Thank you! I need knowledge in this area* !
Reply #32015-10-19
There is a "module" in architectural structure, which is the design calculation in this aspect.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.