HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation method of fiber demister

2008-01-19View Original

Thread Content

Domestically designed fiber demisters are generally installed vertically on the grating, whereas the fiber demisters in MECS’ heat recovery towers are hung upside down from the grating. Installing or replacing them can be rather troublesome. I’m interested in everyone’s opinions on this installation method – please share your views!
Reply #22008-01-20
Personally, I think it is designed based on the amount of acid to be removed; the upper-type is easy to disassemble, while the lower-type has the advantage of facilitating acid removal.
Reply #32008-01-21
The upright configuration requires more installation space, while the inverted (standing) configuration needs less space, allowing the corresponding tower height to be reduced.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.