HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Nitrogen displacement treatment

2008-01-20View Original

Thread Content

Why are some pressure vessels subjected to nitrogen purging after being manufactured? How to replace it? Are there any indicator requirements?
Reply #22008-01-20
I don’t understand; the replacement process mentioned usually refers to one that is harmful to the internal medium, and it’s carried out before maintenance. After manufacturing is complete, nitrogen filling might be used for protection! If the device is not in use
Reply #32008-01-25
After manufacturing, it is generally protected with nitrogen to prevent oxidation and rusting. If the device is shut down for maintenance, oxygen needs to be replaced, as the system cannot contain oxygen; the relevant parameter for this is usually O2
Reply #42008-01-26
It’s not necessary; generally, nitrogen padding is used during manufacturing and delivery to the client, and it is applied to equipment with high requirements.
Reply #52008-01-30
Containers holding flammable and explosive materials must be purged after manufacturing, and nitrogen filling serves not only as a protective measure but also, in most cases, because the containers hold such materials, it is required that the oxygen content be no more than 3%.
Reply #62016-03-07
Where are the rules regarding replacement?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.