HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Elevation of high-pressure equipment required for the urea CO2 stripping process

2008-01-14View Original

Thread Content

Our company uses the Stamicarbon CO2 stripping method from the Netherlands to produce urea. What are the specifications regarding the elevation of the four high-pressure equipment units in this process? Does anyone know? This post was last edited by ymtuegj12 on 2009-1-6 at 17:32.]
Reply #22008-01-15
This design institute has clear regulations on this
Reply #32008-01-20
Our unit is using 1830-grade urea, and the elevation values for the four main components related to urea provided by the design team differ significantly from those I’ve seen before. If anyone knows the exact elevation values for these four components, I would be very grateful!
Reply #42008-01-26
Our contractor is Beijing Zhonghuan Company, and this company is not familiar with these standards. Where can I find information on them? Please advise.
Reply #52008-01-26
It’s still a design institute; which design institute are you looking for?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.